(Friday, Mar. 15 at 08:45)
(Friday, Mar. 15 at 08:45)
Line 21: Line 21:
 
##* One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew.
 
##* One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew.
 
##* [https://logbooks.jlab.org/entry/3667944 One base lost HV near beam line.]
 
##* [https://logbooks.jlab.org/entry/3667944 One base lost HV near beam line.]
 +
#* [https://logbooks.jlab.org/entry/3668020 Monitoring problem with file/DB management. Usually does not happen]
 
# Reports
 
# Reports
 
#* [https://logbooks.jlab.org/entry/3667917 FCAL scalers since LHe target switchover (follow up from disconnected crates)]
 
#* [https://logbooks.jlab.org/entry/3667917 FCAL scalers since LHe target switchover (follow up from disconnected crates)]

Revision as of 08:19, 15 March 2019


Friday, Mar. 15 at 08:45

  1. Past 24 hours:
    • Short access after meeting
    • gluon01 is back with a new kernel and graphics driver
    • Production running
  2. Issues
    • Problematic FCAL channels near beamline
      • One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew.
      • One base lost HV near beam line.
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • TAC run

Thursday, Mar. 14 at 08:45

  1. Past 24 hours:
    • Production running
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
      • There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
    • RF Recovery scheduled for Wednesday