Difference between revisions of "Run Planning Meeting Notes, Mar 14 - Mar 20, 2019"

From GlueXWiki
Jump to: navigation, search
Line 8: Line 8:
 
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-01/index.html Trigger counter]
 
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-01/index.html Trigger counter]
 
* To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227]
 
* To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227]
 +
 +
== Friday, Mar. 15 at 08:45 ==
 +
# Past 24 hours:
 +
#* Short access after meeting
 +
##* [https://logbooks.jlab.org/entry/3667744 Beni/Tim: adjust rotometer flow to 1 L/hr]
 +
##* Sergey and Hovanes: DAQ
 +
##* [https://logbooks.jlab.org/entry/3667703 logbook entry Chris, Colin, Nick, Sasha: FCAL VME crate 11 power supply/ fan issue]
 +
#* gluon01 is back with a new kernel and graphics driver
 +
#* Production running
 +
# Issues
 +
#* Problematic FCAL channels near beamline
 +
##* One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew.
 +
##* [https://logbooks.jlab.org/entry/3667944 One base lost HV near beam line. Access needed? Need to discuss offline how to best HV failures near beamline.]
 +
# Reports
 +
#* []
 +
# Today:
 +
#* Production: 200nA, Al 10<sup>-4</sup>
 +
#Run Plan
 +
#* Production running
 +
#* TAC run
  
 
== Thursday, Mar. 14 at 08:45 ==
 
== Thursday, Mar. 14 at 08:45 ==

Revision as of 01:05, 15 March 2019


Friday, Mar. 15 at 08:45

  1. Past 24 hours:
    • Short access after meeting
    • gluon01 is back with a new kernel and graphics driver
    • Production running
  2. Issues
    • Problematic FCAL channels near beamline
  3. Reports
    • []
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • TAC run

Thursday, Mar. 14 at 08:45

  1. Past 24 hours:
    • Production running
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
      • There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
    • RF Recovery scheduled for Wednesday