(Friday, Mar. 15 at 08:45)
Line 8: Line 8:
 
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-01/index.html Trigger counter]
 
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-01/index.html Trigger counter]
 
* To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227]
 
* To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227]
 +
 +
== Monday, Mar. 18 at 08:45 ==
 +
# Past 24 hours:
 +
#* Short access Friday evening
 +
#* Production running
 +
#* Emptied target at 3:30pm Sunday
 +
#* Attempted TAC run but beam position was too unstable
 +
# Issues
 +
#*
 +
 +
# Reports
 +
#*
  
 
== Friday, Mar. 15 at 08:45 ==
 
== Friday, Mar. 15 at 08:45 ==

Revision as of 07:07, 18 March 2019


Monday, Mar. 18 at 08:45

  1. Past 24 hours:
    • Short access Friday evening
    • Production running
    • Emptied target at 3:30pm Sunday
    • Attempted TAC run but beam position was too unstable
  2. Issues
  1. Reports

Friday, Mar. 15 at 08:45

  1. Past 24 hours:
    • Short access after meeting
    • gluon01 is back with a new kernel and graphics driver
    • Production running
  2. Issues
    • Problematic FCAL channels near beamline
      • One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew.
      • One base lost HV near beam line.Follow up. Access to replace after morning meeting. Friendly reminder: please do not call Colin at night about base problems. Emails and texts are fine.
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • TAC run
    • Hall A performing beam modulation studies Tuesday owl shift. Will cause 1 MeV fluctuations in beam energy. They will do a test Monday morning from 8-9am.

Thursday, Mar. 14 at 08:45

  1. Past 24 hours:
    • Production running
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
      • There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
    • RF Recovery scheduled for Wednesday