Friday, Mar. 15 at 08:45

  1. Past 24 hours:
    • Short access after meeting
    • gluon01 is back with a new kernel and graphics driver
    • Production running
  2. Issues
    • Problematic FCAL channels near beamline
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • TAC run

Thursday, Mar. 14 at 08:45

  1. Past 24 hours:
    • Production running
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
      • There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
    • RF Recovery scheduled for Wednesday