Difference between revisions of "Run Planning Meeting Notes, Mar 19-Mar 25, 2020"

From GlueXWiki
Jump to: navigation, search
(Friday, March 20)
(Friday, March 20)
Line 20: Line 20:
 
# Last 24 hours
 
# Last 24 hours
 
#* Completed 0/90 PARA, 0/90 PERP, 45/135 PARA, 45/135 PERP, AMO 4.5x10-4, begin 0/90 PARA
 
#* Completed 0/90 PARA, 0/90 PERP, 45/135 PARA, 45/135 PERP, AMO 4.5x10-4, begin 0/90 PARA
 +
#* Monitoring Okay [https://logbooks.jlab.org/entry/3806292], [https://logbooks.jlab.org/entry/3806084]
 
#* [https://logbooks.jlab.org/entry/3806367 CDC 2 channel trip on over-current] -- Elton
 
#* [https://logbooks.jlab.org/entry/3806367 CDC 2 channel trip on over-current] -- Elton
 
#** [https://logbooks.jlab.org/entry/3806398 Later ramp up fine.] -- Elton
 
#** [https://logbooks.jlab.org/entry/3806398 Later ramp up fine.] -- Elton

Revision as of 08:36, 20 March 2020

Thursday, March 19

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 20

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production