Difference between revisions of "Run Planning Meeting Notes, Mar 19-Mar 25, 2020"

From GlueXWiki
Jump to: navigation, search
(Tuesday, March 24)
 
(2 intermediate revisions by the same user not shown)
Line 86: Line 86:
  
 
==Tuesday, March 24==
 
==Tuesday, March 24==
# [[MEDCON6 Shutdown Plan]]
 
 
# Last 24 hours
 
# Last 24 hours
 
#* [https://logbooks.jlab.org/entry/3808886 Cavity failure 2l24]
 
#* [https://logbooks.jlab.org/entry/3808886 Cavity failure 2l24]
 
#* Raw mode run while emptying target
 
#* Raw mode run while emptying target
 
#* Empty target running (doubling the existing statistics)  
 
#* Empty target running (doubling the existing statistics)  
 +
#* Baseline study (no-beam run to study SiPMs)
 
#* [https://logbooks.jlab.org/entry/3808678 CCAL integrated in trigger]  [https://logbooks.jlab.org/entry/3808684 and retracted]
 
#* [https://logbooks.jlab.org/entry/3808678 CCAL integrated in trigger]  [https://logbooks.jlab.org/entry/3808684 and retracted]
 
#* Shift Summaries [https://logbooks.jlab.org/entry/3808362 Afternoon] [https://logbooks.jlab.org/entry/3808567 Swing]  [https://logbooks.jlab.org/entry/3808747 Owl] [https://logbooks.jlab.org/entry/3808936 Early Riser]
 
#* Shift Summaries [https://logbooks.jlab.org/entry/3808362 Afternoon] [https://logbooks.jlab.org/entry/3808567 Swing]  [https://logbooks.jlab.org/entry/3808747 Owl] [https://logbooks.jlab.org/entry/3808936 Early Riser]
Line 98: Line 98:
 
# Run Plan
 
# Run Plan
 
#* '''Down Hard'''
 
#* '''Down Hard'''
 +
# [[MEDCON6 Shutdown Plan]]

Latest revision as of 08:42, 24 March 2020

Thursday, March 19

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 20

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production


Saturday, March 21

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Need to plan for MEDCON6 and an orderly shutdown (while maintaining a 6 foot distance or using PPE.)
    • Production

Sunday, March 22

  1. MEDCON6 Shutdown Plan
  2. Last 24 hours
  3. Reports/Issues
  4. Run Plan
    • Production

Monday, March 23

  1. MEDCON6 Shutdown Plan
    • Bring lab to minimum safe ops state.
    • Complete by the end of the week (end of site access)
    • Expect email from management
  2. Last 24 hours
  3. Reports/Issues
    • Transmission drift
    • DIRC Tile temperature alarm (restart DAC)
    • Chromium browser installed to fix window issue
  4. Run Plan
    • Last day of running
    • short TOF trigger test run for CPP experiment: DIRC out, B-field ON at 1350 A (nominal), Detector in nominal position. (I assume this test would be useful even if the Forward carriage was somewhat downstream?)
    • Empty target data

Tuesday, March 24

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Down Hard
  4. MEDCON6 Shutdown Plan