Run Planning Meeting Notes, Mar 19-Mar 25, 2020

From GlueXWiki
Revision as of 08:42, 24 March 2020 by Dalton (Talk | contribs) (Tuesday, March 24)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Thursday, March 19

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production

Friday, March 20

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Production


Saturday, March 21

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Need to plan for MEDCON6 and an orderly shutdown (while maintaining a 6 foot distance or using PPE.)
    • Production

Sunday, March 22

  1. MEDCON6 Shutdown Plan
  2. Last 24 hours
  3. Reports/Issues
  4. Run Plan
    • Production

Monday, March 23

  1. MEDCON6 Shutdown Plan
    • Bring lab to minimum safe ops state.
    • Complete by the end of the week (end of site access)
    • Expect email from management
  2. Last 24 hours
  3. Reports/Issues
    • Transmission drift
    • DIRC Tile temperature alarm (restart DAC)
    • Chromium browser installed to fix window issue
  4. Run Plan
    • Last day of running
    • short TOF trigger test run for CPP experiment: DIRC out, B-field ON at 1350 A (nominal), Detector in nominal position. (I assume this test would be useful even if the Forward carriage was somewhat downstream?)
    • Empty target data

Tuesday, March 24

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Down Hard
  4. MEDCON6 Shutdown Plan