Difference between revisions of "Run Planning Meeting Notes, Mar 21 - Mar 27, 2019"
From GlueXWiki
Line 13: | Line 13: | ||
#* Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac. | #* Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac. | ||
# Issues | # Issues | ||
− | #* | + | #* low counts seen in bcal sector ([https://logbooks.jlab.org/entry/3670196]) |
# Reports | # Reports | ||
− | #* | + | #* helium target refilled, ready |
# Today: | # Today: | ||
#* Production: 200nA, Al 10<sup>-4</sup> | #* Production: 200nA, Al 10<sup>-4</sup> |
Revision as of 07:36, 21 March 2019
Contents
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Thursday, Mar. 21 at 08:45
- Past 24 hours:
- RF recovery during the day shift
- Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac.
- Issues
- low counts seen in bcal sector ([1])
- Reports
- helium target refilled, ready
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday