Difference between revisions of "Run Planning Meeting Notes, Mar 21 - Mar 27, 2019"

From GlueXWiki
Jump to: navigation, search
(Thursday, Mar. 21 at 08:45)
Line 24: Line 24:
 
#*# check radiation monitor rates in tagger hall and Hall D
 
#*# check radiation monitor rates in tagger hall and Hall D
 
#*# verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
 
#*# verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
 +
#* Beam studies planned for day shift on Monday
 +
#* RF Recovery scheduled for Tuesday
 +
 +
== Friday, Mar. 22 at 08:45 ==
 +
# Past 24 hours:
 +
#* beam recovery, conditions checked, running resumed.
 +
# Issues
 +
#* HV tripped on two inner FCal blocks ([https://logbooks.jlab.org/entry/3670196 logbook entry 3670196])
 +
#* HV in CDC tripped, without alarm! ([])
 +
# Reports
 +
# Today:
 +
#* Production: 200nA, Al 10<sup>-4</sup>
 +
#Run Plan
 +
#* Production running continues
 
#* Beam studies planned for day shift on Monday
 
#* Beam studies planned for day shift on Monday
 
#* RF Recovery scheduled for Tuesday
 
#* RF Recovery scheduled for Tuesday

Revision as of 08:41, 22 March 2019

Thursday, Mar. 21 at 08:45

  1. Past 24 hours:
    • RF recovery during the day shift
    • Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac.
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running: when beam returns, check beam conditions as follows:
      1. do harp scans, both accelerator and Hall D radiator
      2. check radiation monitor rates in tagger hall and Hall D
      3. verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday

Friday, Mar. 22 at 08:45

  1. Past 24 hours:
    • beam recovery, conditions checked, running resumed.
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running continues
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday