(Friday, Mar. 22 at 08:45)
Line 37: Line 37:
 
# Today:
 
# Today:
 
#* Production: 200nA, Al 10<sup>-4</sup>
 
#* Production: 200nA, Al 10<sup>-4</sup>
 +
#Run Plan
 +
#* Production running continues
 +
#* Beam studies planned for day shift on Monday
 +
#* RF Recovery scheduled for Tuesday
 +
 +
== Monday, Mar. 25 at 08:45 ==
 +
# Past 72 hours:
 +
#* production running on He target until Sunday 5:30pm
 +
#* continued running on empty target through Monday 8:30am
 +
#* now in controlled access, RF recovery underway
 +
# Issues
 +
#* DAQ interruptions ~1 per shift, recovery not difficult
 +
#* Compcal monitoring plots, timing shows double peak
 +
#* Compcal HV communication failure
 +
#* FCal HV communication failure
 +
#* FCal fadc scalers stop updating
 +
#* Accelerator tightens AC lock constraints
 +
 +
# Reports
 +
# Today:
 +
#* work on solenoid during 9:00am - 12:00pm, warm-up to begin
 +
#* accelerator
 
#Run Plan
 
#Run Plan
 
#* Production running continues
 
#* Production running continues
 
#* Beam studies planned for day shift on Monday
 
#* Beam studies planned for day shift on Monday
 
#* RF Recovery scheduled for Tuesday
 
#* RF Recovery scheduled for Tuesday

Revision as of 08:43, 25 March 2019

Thursday, Mar. 21 at 08:45

  1. Past 24 hours:
    • RF recovery during the day shift
    • Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac.
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running: when beam returns, check beam conditions as follows:
      1. do harp scans, both accelerator and Hall D radiator
      2. check radiation monitor rates in tagger hall and Hall D
      3. verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday

Friday, Mar. 22 at 08:45

  1. Past 24 hours:
    • beam recovery, conditions checked, running resumed.
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running continues
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday

Monday, Mar. 25 at 08:45

  1. Past 72 hours:
    • production running on He target until Sunday 5:30pm
    • continued running on empty target through Monday 8:30am
    • now in controlled access, RF recovery underway
  2. Issues
    • DAQ interruptions ~1 per shift, recovery not difficult
    • Compcal monitoring plots, timing shows double peak
    • Compcal HV communication failure
    • FCal HV communication failure
    • FCal fadc scalers stop updating
    • Accelerator tightens AC lock constraints
  1. Reports
  2. Today:
    • work on solenoid during 9:00am - 12:00pm, warm-up to begin
    • accelerator
  3. Run Plan
    • Production running continues
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday