Difference between revisions of "Run Planning Meeting Notes, Mar 21 - Mar 27, 2019"
From GlueXWiki
(→Friday, Mar. 22 at 08:45) |
|||
Line 37: | Line 37: | ||
# Today: | # Today: | ||
#* Production: 200nA, Al 10<sup>-4</sup> | #* Production: 200nA, Al 10<sup>-4</sup> | ||
+ | #Run Plan | ||
+ | #* Production running continues | ||
+ | #* Beam studies planned for day shift on Monday | ||
+ | #* RF Recovery scheduled for Tuesday | ||
+ | |||
+ | == Monday, Mar. 25 at 08:45 == | ||
+ | # Past 72 hours: | ||
+ | #* production running on He target until Sunday 5:30pm | ||
+ | #* continued running on empty target through Monday 8:30am | ||
+ | #* now in controlled access, RF recovery underway | ||
+ | # Issues | ||
+ | #* DAQ interruptions ~1 per shift, recovery not difficult | ||
+ | #* Compcal monitoring plots, timing shows double peak | ||
+ | #* Compcal HV communication failure | ||
+ | #* FCal HV communication failure | ||
+ | #* FCal fadc scalers stop updating | ||
+ | #* Accelerator tightens AC lock constraints | ||
+ | |||
+ | # Reports | ||
+ | # Today: | ||
+ | #* work on solenoid during 9:00am - 12:00pm, warm-up to begin | ||
+ | #* accelerator | ||
#Run Plan | #Run Plan | ||
#* Production running continues | #* Production running continues | ||
#* Beam studies planned for day shift on Monday | #* Beam studies planned for day shift on Monday | ||
#* RF Recovery scheduled for Tuesday | #* RF Recovery scheduled for Tuesday |
Revision as of 08:43, 25 March 2019
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Thursday, Mar. 21 at 08:45
- Past 24 hours:
- RF recovery during the day shift
- Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac.
- Issues
- low counts seen in bcal sector (logbook entry 3670196)
- Reports
- helium target refilled, ready
- trigger rate and beam flux history for Spring 2019 run
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running: when beam returns, check beam conditions as follows:
- do harp scans, both accelerator and Hall D radiator
- check radiation monitor rates in tagger hall and Hall D
- verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Production running: when beam returns, check beam conditions as follows:
Friday, Mar. 22 at 08:45
- Past 24 hours:
- beam recovery, conditions checked, running resumed.
- Issues
- HV tripped on two inner FCal blocks (logbook entry 3670196)
- HV in CDC tripped, without alarm! (logbook entry 3670885)
- Reports
- collimator transmission drops again (logbook entry 3670862)
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running continues
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
Monday, Mar. 25 at 08:45
- Past 72 hours:
- production running on He target until Sunday 5:30pm
- continued running on empty target through Monday 8:30am
- now in controlled access, RF recovery underway
- Issues
- DAQ interruptions ~1 per shift, recovery not difficult
- Compcal monitoring plots, timing shows double peak
- Compcal HV communication failure
- FCal HV communication failure
- FCal fadc scalers stop updating
- Accelerator tightens AC lock constraints
- Reports
- Today:
- work on solenoid during 9:00am - 12:00pm, warm-up to begin
- accelerator
- Run Plan
- Production running continues
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday