(Tuesday, Mar. 26 at 08:45)
(Tuesday, Mar. 26 at 08:45)
Line 72: Line 72:
 
# Past 24 hours:
 
# Past 24 hours:
 
#* access day shift on Monday, out at 3:00pm
 
#* access day shift on Monday, out at 3:00pm
#* beam restored by
+
#* beam restored by 18:30
 
#* empty-target running continues
 
#* empty-target running continues
 
# Issues
 
# Issues
Line 92: Line 92:
 
#* machine rf recovery during day shift
 
#* machine rf recovery during day shift
 
#* did we get enough empty target data, are we ready to fill the He target?
 
#* did we get enough empty target data, are we ready to fill the He target?
 +
# Run Plan
 +
#* Production running continues
 +
 +
== Wednesday, Mar. 27 at 08:45 ==
 +
# Past 24 hours:
 +
#* access day shift on Tuesday, filled the He target, out by 11:00am
 +
#* beam restored by 12:00
 +
#* He-target running continues
 +
# Issues
 +
# Reports
 +
# Today:
 
# Run Plan
 
# Run Plan
 
#* Production running continues
 
#* Production running continues

Revision as of 07:03, 27 March 2019

Thursday, Mar. 21 at 08:45

  1. Past 24 hours:
    • RF recovery during the day shift
    • Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac.
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running: when beam returns, check beam conditions as follows:
      1. do harp scans, both accelerator and Hall D radiator
      2. check radiation monitor rates in tagger hall and Hall D
      3. verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday

Friday, Mar. 22 at 08:45

  1. Past 24 hours:
    • beam recovery, conditions checked, running resumed.
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running continues
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday

Monday, Mar. 25 at 08:45

  1. Past 72 hours:
    • production running on He target until Sunday 5:30pm
    • continued running on empty target through Monday 8:30am
    • now in controlled access, RF recovery underway
  2. Issues
  3. Reports
    • Several reference plots for monitoring histograms out of date (logbook entry 3671340)
    • Active collimator lock is mostly working, sometimes fights to keep up (logbook entry 3671214)
    • Accelerator using machine development time to investigate this effect in Hall D
  4. Today:
    • work on solenoid during 9:00am - 12:00pm, warm-up to begin (logbook entry 3670889)
    • accelerator plans to work on Hall D line optics during second half of day shift
  5. Run Plan
    • Production running continues
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday

Tuesday, Mar. 26 at 08:45

  1. Past 24 hours:
    • access day shift on Monday, out at 3:00pm
    • beam restored by 18:30
    • empty-target running continues
  2. Issues
    • Ongoing problems with dropped communication to CDC HV crate (logbook entry 3671943, crate rebooted)
    • Reboot of CompCal HV crate failed to restore comms, crate is replaced (logbook entry 3671980)
    • Accelerator switched to manual current adjustment overnight, attenuator problems (logbook entry 3672307)
    • Ongoing DAQ issues (logbook entry 3672178)
    • Advice to shift crew
      1. shift summaries are great for overview of what happened during a shift
      2. this summary is NOT a replacement for separate logbook entries related to exceptional conditions or events
      3. PLEASE make separate logbook entries to report ANY SIGNIFICANT ISSUES that come up!
      4. without these, it is difficult to search the record, create follow-up entries, post plots, etc.
  3. Reports
  4. Today:
    • machine rf recovery during day shift
    • did we get enough empty target data, are we ready to fill the He target?
  5. Run Plan
    • Production running continues

Wednesday, Mar. 27 at 08:45

  1. Past 24 hours:
    • access day shift on Tuesday, filled the He target, out by 11:00am
    • beam restored by 12:00
    • He-target running continues
  2. Issues
  3. Reports
  4. Today:
  5. Run Plan
    • Production running continues