Run Planning Meeting Notes, Mar 21 - Mar 27, 2019

From GlueXWiki
Revision as of 09:51, 25 March 2019 by Jonesrt (Talk | contribs) (Monday, Mar. 25 at 08:45)

Jump to: navigation, search

Thursday, Mar. 21 at 08:45

  1. Past 24 hours:
    • RF recovery during the day shift
    • Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac.
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running: when beam returns, check beam conditions as follows:
      1. do harp scans, both accelerator and Hall D radiator
      2. check radiation monitor rates in tagger hall and Hall D
      3. verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday

Friday, Mar. 22 at 08:45

  1. Past 24 hours:
    • beam recovery, conditions checked, running resumed.
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running continues
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday

Monday, Mar. 25 at 08:45

  1. Past 72 hours:
    • production running on He target until Sunday 5:30pm
    • continued running on empty target through Monday 8:30am
    • now in controlled access, RF recovery underway
  2. Issues
  1. Reports
    • Several reference plots for monitoring histograms out of date (logbook entry 3671340)
    • Active collimator lock is mostly working, sometimes fights to keep up (logbook entry 3671214)
    • Accelerator using machine development time to investigate this effect in Hall D
  2. Today:
  3. Run Plan
    • Production running continues
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday