Difference between revisions of "Run Planning Meeting Notes, Mar 28 - Apr 3, 2019"

From GlueXWiki
Jump to: navigation, search
m
Line 13: Line 13:
 
#* [https://logbooks.jlab.org/entry/3673363 DAQ crash swing shift]
 
#* [https://logbooks.jlab.org/entry/3673363 DAQ crash swing shift]
 
# Issues
 
# Issues
#* [https://logbooks.jlab.org/entry/3673377][https://logbooks.jlab.org/entry/3673391]
+
#* Monitoring plots should be regularly sent to the logbook! [https://logbooks.jlab.org/entry/3673377][https://logbooks.jlab.org/entry/3673391]
 
# Reports
 
# Reports
#*
+
#*[[snapshot of halld_ops Slack]]
 
# Today:
 
# Today:
 
#* Production: 200nA, Al 10<sup>-4</sup>
 
#* Production: 200nA, Al 10<sup>-4</sup>

Revision as of 22:29, 28 March 2019

Friday, Mar. 29 at 08:45

  1. Past 24 hours:
  2. Issues
    • Monitoring plots should be regularly sent to the logbook! [1][2]
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Accesses(?)
      • Beam studies planned for day shift on Monday
      • RF Recovery scheduled for Tuesday
    • Switching back to empty target?
    • End of run is coming...

Thursday, Mar. 28 at 08:45

  1. Past 24 hours:
    • Pass change for hall C
    • Separator issues, 4th and 5th pass
    • Minor drifts in the Active Collimator lock
    • Minor drifts in beam current
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
    • Short interruption by MCC to continue investigation of separator issues from last night
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?