Difference between revisions of "Run Planning Meeting Notes, Mar 28 - Apr 3, 2019"

From GlueXWiki
Jump to: navigation, search
m
m
Line 7: Line 7:
 
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-01/index.html Trigger counter]
 
* [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-01/index.html Trigger counter]
 
* To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227]
 
* To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227]
 +
 +
== Saturday, Mar. 30 - No Meeting ==
  
 
== Friday, Mar. 29 at 08:45 ==
 
== Friday, Mar. 29 at 08:45 ==

Revision as of 14:18, 29 March 2019

Saturday, Mar. 30 - No Meeting

Friday, Mar. 29 at 08:45

  1. Past 24 hours:
  2. Issues
    • Monitoring plots should be regularly sent to the logbook! [1][2]
    • Rates are still falling
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Accesses(?)
      • Beam studies planned for day shift on Monday
      • RF Recovery scheduled for Tuesday
    • Switching back to empty target?
    • End of run is coming...

Thursday, Mar. 28 at 08:45

  1. Past 24 hours:
    • Pass change for hall C
    • Separator issues, 4th and 5th pass
    • Minor drifts in the Active Collimator lock
    • Minor drifts in beam current
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
    • Short interruption by MCC to continue investigation of separator issues from last night
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?