Difference between revisions of "Run Planning Meeting Notes, Mar 28 - Apr 3, 2019"

From GlueXWiki
Jump to: navigation, search
m
m
Line 10: Line 10:
 
== Monday, Apr. 1 at 08:45 ==
 
== Monday, Apr. 1 at 08:45 ==
 
# Notes from the weekend
 
# Notes from the weekend
#* [https://logbooks.jlab.org/entry/3673930 Solenoid turbo pump] [https://logbooks.jlab.org/entry/3673904]
+
#* [https://logbooks.jlab.org/entry/3673930 Solenoid turbo pump] [https://logbooks.jlab.org/entry/3673904][https://logbooks.jlab.org/entry/3674354]
 
#* [https://logbooks.jlab.org/entry/3674023 Orbit and separator adjustments]
 
#* [https://logbooks.jlab.org/entry/3674023 Orbit and separator adjustments]
 
#* North Linac turbo pump
 
#* North Linac turbo pump
 
# Issues
 
# Issues
 
#* [https://logbooks.jlab.org/entry/3674326 CODADAQ alarm in EPICS]
 
#* [https://logbooks.jlab.org/entry/3674326 CODADAQ alarm in EPICS]
 +
#* [https://logbooks.jlab.org/entry/3674372 Couple of new FCal holes in monitoring plots]
 +
#* Active Collimator positions drifting
 
# Reports
 
# Reports
 
# Today
 
# Today
#* Beam studies
+
#* Beam studies/RF recovery merged into today
 
#* Switch to Empty target
 
#* Switch to Empty target
 
# Run Plan
 
# Run Plan
 
#* When beam resumes, harp scans, then production running on empty target, 200nA, 10<sup>-4</sup> Al
 
#* When beam resumes, harp scans, then production running on empty target, 200nA, 10<sup>-4</sup> Al
#* Tuesday, RF recovery. Refill target
+
#* Tuesday, RF recovery may not happen. Refill target
 
#* End of run in two weeks time...
 
#* End of run in two weeks time...
 
# AOB
 
# AOB

Revision as of 08:31, 1 April 2019

Monday, Apr. 1 at 08:45

  1. Notes from the weekend
  2. Issues
  3. Reports
  4. Today
    • Beam studies/RF recovery merged into today
    • Switch to Empty target
  5. Run Plan
    • When beam resumes, harp scans, then production running on empty target, 200nA, 10-4 Al
    • Tuesday, RF recovery may not happen. Refill target
    • End of run in two weeks time...
  6. AOB

Sunday, Mar. 31 - No Meeting

Saturday, Mar. 30 - No Meeting

Friday, Mar. 29 at 08:45

  1. Past 24 hours:
  2. Issues
    • Monitoring plots should be regularly sent to the logbook! [4][5]
    • Rates are still falling
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Accesses(?)
      • Beam studies planned for day shift on Monday
      • RF Recovery scheduled for Tuesday
    • Switching back to empty target?
    • End of run is coming...

Thursday, Mar. 28 at 08:45

  1. Past 24 hours:
    • Pass change for hall C
    • Separator issues, 4th and 5th pass
    • Minor drifts in the Active Collimator lock
    • Minor drifts in beam current
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
    • Short interruption by MCC to continue investigation of separator issues from last night
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?