Difference between revisions of "Run Planning Meeting Notes, Mar 28 - Apr 3, 2019"

From GlueXWiki
Jump to: navigation, search
m
Line 13: Line 13:
 
#* Accesses
 
#* Accesses
 
#* Target now EMPTY
 
#* Target now EMPTY
 +
#* [https://logbooks.jlab.org/entry/3674531][https://logbooks.jlab.org/entry/3674536][https://logbooks.jlab.org/entry/3674704]
 
# Issues
 
# Issues
 +
#* [https://logbooks.jlab.org/entry/3674657 Beam position excursions Owl shift]
 +
#* [https://logbooks.jlab.org/entry/3674684 identical plots in monitoring]
 
#* HD-01 key rubber
 
#* HD-01 key rubber
 +
#* Gluon 04 prompting for update installation
 
# Reports
 
# Reports
 
#*
 
#*
Line 20: Line 24:
 
#* Refill target
 
#* Refill target
 
#* Harp scan
 
#* Harp scan
#* Raster and active collimator calibration
+
#* Possible raster scan and active collimator calibration
 
# Run Plan
 
# Run Plan
 
#* Production running, 200nA, 10<sup>-4</sup> Al
 
#* Production running, 200nA, 10<sup>-4</sup> Al

Revision as of 08:21, 2 April 2019

Tuesday, Apr. 2 at 08:45

  1. Notes from the past 24 hours
    • Beam studies
    • Accesses
    • Target now EMPTY
    • [1][2][3]
  2. Issues
  3. Reports
  4. Today
    • Refill target
    • Harp scan
    • Possible raster scan and active collimator calibration
  5. Run Plan
    • Production running, 200nA, 10-4 Al
    • End of run in two weeks time...

Monday, Apr. 1 at 08:45

  1. Notes from the weekend
  2. Issues
  3. Reports
  4. Today
    • Beam studies/RF recovery merged into today
    • Switch to Empty target
  5. Run Plan
    • When beam resumes, harp scans, then production running on empty target, 200nA, 10-4 Al
    • Tuesday, RF recovery may not happen. Refill target
    • End of run in two weeks time...
  6. AOB

Sunday, Mar. 31 - No Meeting

Saturday, Mar. 30 - No Meeting

Friday, Mar. 29 at 08:45

  1. Past 24 hours:
  2. Issues
    • Monitoring plots should be regularly sent to the logbook! [7][8]
    • Rates are still falling
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Accesses(?)
      • Beam studies planned for day shift on Monday
      • RF Recovery scheduled for Tuesday
    • Switching back to empty target?
    • End of run is coming...

Thursday, Mar. 28 at 08:45

  1. Past 24 hours:
    • Pass change for hall C
    • Separator issues, 4th and 5th pass
    • Minor drifts in the Active Collimator lock
    • Minor drifts in beam current
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
    • Short interruption by MCC to continue investigation of separator issues from last night
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?