Run Planning Meeting Notes, Mar 28 - Apr 3, 2019

From GlueXWiki
Revision as of 08:31, 1 April 2019 by Sfegan (Talk | contribs)

Jump to: navigation, search

Monday, Apr. 1 at 08:45

  1. Notes from the weekend
  2. Issues
  3. Reports
  4. Today
    • Beam studies/RF recovery merged into today
    • Switch to Empty target
  5. Run Plan
    • When beam resumes, harp scans, then production running on empty target, 200nA, 10-4 Al
    • Tuesday, RF recovery may not happen. Refill target
    • End of run in two weeks time...
  6. AOB

Sunday, Mar. 31 - No Meeting

Saturday, Mar. 30 - No Meeting

Friday, Mar. 29 at 08:45

  1. Past 24 hours:
  2. Issues
    • Monitoring plots should be regularly sent to the logbook! [4][5]
    • Rates are still falling
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
  5. Run Plan
    • Production running
    • Accesses(?)
      • Beam studies planned for day shift on Monday
      • RF Recovery scheduled for Tuesday
    • Switching back to empty target?
    • End of run is coming...

Thursday, Mar. 28 at 08:45

  1. Past 24 hours:
    • Pass change for hall C
    • Separator issues, 4th and 5th pass
    • Minor drifts in the Active Collimator lock
    • Minor drifts in beam current
  2. Issues
  3. Reports
  4. Today:
    • Production: 200nA, Al 10-4
    • Short interruption by MCC to continue investigation of separator issues from last night
  5. Run Plan
    • Production running
    • Beam studies planned for day shift on Monday
    • RF Recovery scheduled for Tuesday
    • Switching back to empty target?