Difference between revisions of "Run Planning Meeting Notes, Mar 29-Apr 4, 2018"

From GlueXWiki
Jump to: navigation, search
(Created page with "<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run == Thursday, March 28 at 08:45 == # Notes from the previous 24 hours: #* RF separator tested out ok, aimed to...")
 
(Thursday, March 28 at 08:45)
Line 10: Line 10:
 
#* Diamond spot adjustment (Hovanes)
 
#* Diamond spot adjustment (Hovanes)
 
#* CDC Background Studies (Lubomir et al.)
 
#* CDC Background Studies (Lubomir et al.)
#* PS High Rate Check (Alex S) ? from Sunday's list
 
 
#* Converter thickness study (Alex S.)
 
#* Converter thickness study (Alex S.)
 
#* SSP Study (Alex S.)
 
#* SSP Study (Alex S.)
 
#* Production running
 
#* Production running
 
# AOB
 
# AOB

Revision as of 23:42, 28 March 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, March 28 at 08:45

  1. Notes from the previous 24 hours:
    • RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
    • 0800 MCC meeting notes
  2. Reports:
  3. Run Plan
    • Restablish Photon beam
    • Diamond spot adjustment (Hovanes)
    • CDC Background Studies (Lubomir et al.)
    • Converter thickness study (Alex S.)
    • SSP Study (Alex S.)
    • Production running
  4. AOB