# Reports: | # Reports: | ||
# Run Plan | # Run Plan | ||
− | #* [[Run_Coordination_Meetings:Fall2017_Spring2018_Run/March_recovery| | + | #* [[Run_Coordination_Meetings:Fall2017_Spring2018_Run/March_recovery|Re-establish Photon beam]] |
+ | #* 1h production to check beam quality & detectors | ||
#* Diamond spot adjustment (Hovanes) | #* Diamond spot adjustment (Hovanes) | ||
#* CDC Background Studies (Lubomir et al.) | #* CDC Background Studies (Lubomir et al.) |
Revision as of 08:31, 29 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 28 at 08:45
- Notes from the previous 24 hours:
- RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
- Beam arrived just before midnight, convergence not good, owl shift spent tuning
- 0800 MCC meeting notes
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Is there a how-to page for the BTA sheet? (load from epics, edit etc & guidelines on ABU/BANU)
- Reports:
- Run Plan
- Re-establish Photon beam
- 1h production to check beam quality & detectors
- Diamond spot adjustment (Hovanes)
- CDC Background Studies (Lubomir et al.)
- Converter thickness study (Alex S.)
- SSP Study (Alex S.)
- Production running
- AOB