Difference between revisions of "Run Planning Meeting Notes, Mar 29-Apr 4, 2018"
From GlueXWiki
(→Friday, March 29 at 08:45) |
(→Friday, March 29 at 08:45) |
||
Line 29: | Line 29: | ||
#* [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] | #* [https://cebaf.jlab.org/files/ops/accboard/ MCC whiteboard] | ||
#Issues: | #Issues: | ||
− | |||
#* Some rootspy hiccups, hopefully fixed | #* Some rootspy hiccups, hopefully fixed | ||
+ | #* Beam steering locks & tagger current | ||
+ | #* [[BTA guidelines]] | ||
# Reports: | # Reports: | ||
# Run Plan | # Run Plan |
Revision as of 08:37, 30 March 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Thursday, March 28 at 08:45
- Notes from the previous 24 hours:
- RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
- Beam arrived just before midnight, convergence not good, owl shift spent tuning
- 0800 MCC meeting notes - Todd retuning; planning machine work 4h Mon, 8h Tues MCC whiteboard
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Is there a how-to page for the BTA sheet? (load from epics, edit etc & guidelines on ABU/BANU)
- Reports:
- Run Plan
- Re-establish Photon beam
- 1h production to check beam quality & detectors
- Diamond spot adjustment (Hovanes, needs to start before noon or try again tomorrow)
- CDC Background Studies (Lubomir et al.)
- Converter thickness study (Alex S.)
- SSP Study (Alex S., postpone to early next week)
- Production running
- AOB
Friday, March 29 at 08:45
- Notes from the previous 24 hours:
- Todd retuned Hall D beamline Thursday morning, considerable improvement
- Hovanes set diamond positions but didn't have time for spot adjustment, #1 for today
- CDC background studies completed ?
- Beam became less reliable throughout swing shift, improved after midnight
- 0800 MCC meeting notes - beam studies 0830-1230 Monday
- MCC whiteboard
- Issues:
- Some rootspy hiccups, hopefully fixed
- Beam steering locks & tagger current
- BTA guidelines
- Reports:
- Run Plan
- Schematic
- Diamond spot adjustment (Hovanes)
- Converter thickness study (Alex S.)
- Production running through weekend
- Next meeting: Sunday morning?
- AOB