(Friday, March 29 at 08:45)
(Friday, March 29 at 08:45)
Line 38: Line 38:
 
#* Converter thickness study (Alex S.)
 
#* Converter thickness study (Alex S.)
 
#* Production running through weekend
 
#* Production running through weekend
# Next meeting: Sunday morning?
+
# Next meeting: ?
 
# AOB
 
# AOB

Revision as of 08:37, 30 March 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, March 28 at 08:45

  1. Notes from the previous 24 hours:
    • RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
    • Beam arrived just before midnight, convergence not good, owl shift spent tuning
    • 0800 MCC meeting notes - Todd retuning; planning machine work 4h Mon, 8h Tues MCC whiteboard
  2. Issues:
    • Shift-takers should at least log any acknowledged alarms so that they are not forgotten
    • Is there a how-to page for the BTA sheet? (load from epics, edit etc & guidelines on ABU/BANU)
  3. Reports:
  4. Run Plan
    • Re-establish Photon beam
    • 1h production to check beam quality & detectors
    • Diamond spot adjustment (Hovanes, needs to start before noon or try again tomorrow)
    • CDC Background Studies (Lubomir et al.)
    • Converter thickness study (Alex S.)
    • SSP Study (Alex S., postpone to early next week)
    • Production running
  5. AOB

Friday, March 29 at 08:45

  1. Notes from the previous 24 hours:
      • Todd retuned Hall D beamline Thursday morning, considerable improvement
      • Hovanes set diamond positions but didn't have time for spot adjustment, #1 for today
      • CDC background studies completed ?
      • Beam became less reliable throughout swing shift, improved after midnight
    • 0800 MCC meeting notes - beam studies 0830-1230 Monday
    • MCC whiteboard
  2. Issues:
    • Some rootspy hiccups, hopefully fixed
    • Beam steering locks & tagger current
    • BTA guidelines
  3. Reports:
  4. Run Plan
    • Schematic
    • Diamond spot adjustment (Hovanes)
    • Converter thickness study (Alex S.)
    • Production running through weekend
  5. Next meeting: ?
  6. AOB