Run Planning Meeting Notes, Mar 29-Apr 4, 2018

From GlueXWiki
Revision as of 22:18, 30 March 2018 by Njarvis (Talk | contribs) (Sunday, April 1 at 10:00)

Jump to: navigation, search

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, March 28 at 08:45

  1. Notes from the previous 24 hours:
    • RF separator tested out ok, aimed to restore beam for swing shift but delayed due to CHL issues
    • Beam arrived just before midnight, convergence not good, owl shift spent tuning
    • 0800 MCC meeting notes - Todd retuning; planning machine work 4h Mon, 8h Tues MCC whiteboard
  2. Issues:
    • Shift-takers should at least log any acknowledged alarms so that they are not forgotten
    • Is there a how-to page for the BTA sheet? (load from epics, edit etc & guidelines on ABU/BANU)
  3. Reports:
  4. Run Plan
    • Re-establish Photon beam
    • 1h production to check beam quality & detectors
    • Diamond spot adjustment (Hovanes, needs to start before noon or try again tomorrow)
    • CDC Background Studies (Lubomir et al.)
    • Converter thickness study (Alex S.)
    • SSP Study (Alex S., postpone to early next week)
    • Production running
  5. AOB

Friday, March 29 at 08:45

  1. Notes from the previous 24 hours:
      • Todd retuned Hall D beamline Thursday morning, considerable improvement
      • Hovanes set diamond positions but didn't have time for spot adjustment, #1 for today
      • CDC background studies completed ?
      • Beam became less reliable throughout swing shift, improved after midnight
    • 0800 MCC meeting notes - beam studies 0830-1230 Monday
    • MCC whiteboard
  2. Issues:
    • Some rootspy hiccups, hopefully fixed
    • Beam steering locks on 5C11B were off, there should be locks on 5C11B and the active collimator
    • Tagger quadrupole current had loaded incorrect default value during tuning! MCC will correct the default and add alarms.
    • BTA guidelines
  3. Reports:
  4. Run Plan
    • Schematic
    • Diamond spot adjustment (Hovanes, 2h) - done
    • Converter thickness study (Alex S., 2h) - done, needs to check data quality
    • CDC high thresholds (Beni, 2h) - abandoned, will try again later
    • Production running through weekend, with possible 0.5h trigger work from Alex S.
    • Over the weekend Richard will do prep work for the TAC run on Wed.
  5. Next meeting: Sunday 10am
  6. Thanks and best wishes to Tom Carstens who retires today

Sunday, April 1 at 10:00

  1. Notes from the previous 48 hours:
    • Friday morning Hovanes identified a new beam spot; Sasha took converter thickness data
    • Friday pm started CDC high threshold runs but lost beam due to Hall C's boiling study & recovery was slow
    • Friday eve weather event probably caused CDC gas pressure alarms
    • Gas shed key is absent
    • MCC whiteboard
  2. Issues:
  3. Reports:
  4. Run Plan
    • Schematic
    • Production running through weekend, with possible 0.5h trigger work from Alex S.
    • Access on Monday?
  5. AOB