(Sunday, March 5)
(Sunday, March 5)
Line 171: Line 171:
 
#* Harp scan including beam dump radiator: [https://logbooks.jlab.org/entry/3464870 1], [https://logbooks.jlab.org/entry/3464879 2]
 
#* Harp scan including beam dump radiator: [https://logbooks.jlab.org/entry/3464870 1], [https://logbooks.jlab.org/entry/3464879 2]
 
#* [https://logbooks.jlab.org/entry/3465002 FCAL hole] - Bad board in ROCFCAL12, slot 18
 
#* [https://logbooks.jlab.org/entry/3465002 FCAL hole] - Bad board in ROCFCAL12, slot 18
#* Low photon flux data taken during owl shift
+
#* Low photon flux data taken during owl shift, ~14M triggers
 
#* In the last 24 hours:  
 
#* In the last 24 hours:  
 
#** Total triggers collected during last period: 2338M
 
#** Total triggers collected during last period: 2338M
Line 187: Line 187:
 
#** Tuesday: Beam studies - 9 AM to 2+ PM
 
#** Tuesday: Beam studies - 9 AM to 2+ PM
 
# Offline Analysis
 
# Offline Analysis
 +
#* TAC runs?
 +
# AOB
 +
 +
==Monday, March 6==
 +
 +
{|border
 +
|-
 +
! Shift  !! ABU !! BNA !! BANU
 +
|-
 +
 +
|}
 +
 +
# Accelerator Status over the last 24 hrs
 +
#* Good beam ?
 +
#* AC slow locks: [https://logbooks.jlab.org/entry/3465035 1], [https://logbooks.jlab.org/entry/3465100 2]
 +
#* Strip charts: [https://logbooks.jlab.org/entry/ 1] [https://logbooks.jlab.org/entry/ 2] [https://logbooks.jlab.org/entry/ 3]
 +
# Hall-D/GlueX items
 +
#* [https://logbooks.jlab.org/entry/3465219 Bad fadc250, rocfcal12, slot 18]
 +
#* In the last 24 hours:
 +
#** Total triggers collected during last period:
 +
#** Run Statistics [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1113040681 Spread Sheet]
 +
#** Current Total: B
 +
# Issues
 +
#* Bad FCAL fADC250, low on spares
 +
#* Known DAQ problems with live time, online monitoring reliability
 +
# Monitoring
 +
#* [https://logbooks.jlab.org/entry/ low-level report]
 +
# Run Plan
 +
#* More Production Data
 +
#* High rate run [500 nA]
 +
#* Low rate run [50 nA + 2x10^-5 RL Al]
 +
#* Anything else?
 +
#* Tentative Accelerator Schedule:
 +
#** Monday: Establish beam to Hall C - 9 AM to 1 PM
 +
#** Tuesday: Beam studies - 9 AM to 2+ PM
 +
# Offline Analysis
 +
#* Calibration update
 +
#** [https://logbooks.jlab.org/entry/3464965 F1TDC Start Counter/Tagger study]
 +
#* Offline Monitoring update
 
#* TAC runs?
 
#* TAC runs?
 
# AOB
 
# AOB

Revision as of 22:39, 5 March 2017

<- Back to Run Coordination Meetings: Spring 2017 Run

Thursday, March 2

Shift ABU BNA BANU
Day 6.49 0.63 0.88
Swing 6.97 0.32 0.71
Owl 7.09 0.11 0.80
Total 20.55 1.06 2.39


  1. Accelerator Status over the last 24 hrs
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • Production data taken after 10:30 AM Weds.
      • Long mode run
      • Black spots on diamonds
      • Total triggers collected during last period: 3099M
      • Run Statistics Spread Sheet
      • Current Total: 40.05B
  3. Issues
    • Problems with FCAL crate 9
    • FCAL red light issue
    • TRD gas issue
    • DAQ issues:
      • 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
      • ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
  4. Monitoring
  5. Run Plan
    • Production
    • Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
  6. Offline Analysis
    • TAC runs?
  7. AOB

Friday, March 3

Shift ABU BNA BANU
Day 0.79 0.00 7.21
Swing 4.75 0.75 2.50
Owl 6.83 0.08 1.09
Total 12.37 0.83 10.80


  1. Accelerator Status over the last 24 hrs
    • Vacuum issues [~8 hours down]
    • 1630 - Beam back
    • 1730 - Attempt at trigger & DAQ studies
      • 1800 to 1840 - ACC access to replace controller
      • 1900 to 1930 - FSD Card swap
    • 2000 - Start of production
      • 500 - 20 min down due to cryomodule problems
    • Strip charts: 1 2
  2. Hall-D/GlueX items
  3. Issues
    • Red lines on run control GUI?
    • Front-panel triggers off for 30920-2
    • Firefox problems
  4. Monitoring
  5. Run Plan
    • Tagger/SC trigger
    • Hall A Bleed-through?
    • Empty target run?
    • fADC250 Compressed Mode?
    • Production
    • Next week:
      • High rate run [500 nA]
      • Low rate run [50 nA + 2x10^-5 RL Al]
  6. Offline Analysis
    • TAC runs?
  7. AOB


Saturday, March 4

Shift ABU BNA BANU
Day 6.79 0.03 1.18
Swing 6.17 1.12 0.71
Owl 7.29 0.07 0.64
Total 20.25 1.22 2.53
  1. Accelerator Status over the last 24 hrs
    • Steady beam delivery
    • New slow lock status display logbook entry
    • Strip charts: 1 2 3
  2. Hall-D/GlueX items
    • Tagger/SC trigger studies
    • Hall A Bleed-through study: 1 2
    • Empty target run accomplished
    • fADC250 Compressed Mode Study
    • Better downtime tracking in elog
    • In the last 24 hours:
      • Total triggers collected during last period: 1771M
      • Run Statistics Spread Sheet
      • Current Total: 42.8B
  3. Issues
    • ~2hrs lost to DAQ problems on Fri. morning
  4. Monitoring
  5. Run Plan
    • Production + Afternoon harp scan
    • Next week:
      • High rate run [500 nA]
      • Low rate run [50 nA + 2x10^-5 RL Al]
  6. Offline Analysis
  7. AOB

Sunday, March 5

Shift ABU BNA BANU
Day 6.94 0.32 0.74
Swing 7.31 0.17 0.52
Owl 6.78 0.03 1.19
Total 21.03 0.52 2.45
  1. Accelerator Status over the last 24 hrs
  2. Hall-D/GlueX items
    • Harp scan including beam dump radiator: 1, 2
    • FCAL hole - Bad board in ROCFCAL12, slot 18
    • Low photon flux data taken during owl shift, ~14M triggers
    • In the last 24 hours:
      • Total triggers collected during last period: 2338M
      • Run Statistics Spread Sheet
      • Current Total: 45.1B
  3. Issues
    • Bad FCAL fADC250, low on spares
    • Known DAQ problems with EB/cMsg
  4. Monitoring
  5. Run Plan
    • Production Data
    • Tentative Accelerator Schedule:
      • Monday: Establish beam to Hall C - 9 AM to 1 PM
      • Tuesday: Beam studies - 9 AM to 2+ PM
  6. Offline Analysis
    • TAC runs?
  7. AOB

Monday, March 6

Shift ABU BNA BANU
  1. Accelerator Status over the last 24 hrs
    • Good beam ?
    • AC slow locks: 1, 2
    • Strip charts: 1 2 3
  2. Hall-D/GlueX items
  3. Issues
    • Bad FCAL fADC250, low on spares
    • Known DAQ problems with live time, online monitoring reliability
  4. Monitoring
  5. Run Plan
    • More Production Data
    • High rate run [500 nA]
    • Low rate run [50 nA + 2x10^-5 RL Al]
    • Anything else?
    • Tentative Accelerator Schedule:
      • Monday: Establish beam to Hall C - 9 AM to 1 PM
      • Tuesday: Beam studies - 9 AM to 2+ PM
  6. Offline Analysis
  7. AOB