Run Planning Meeting Notes, Mar 2 - Mar 8, 2017

From GlueXWiki
Revision as of 11:15, 2 March 2017 by Sdobbs (Talk | contribs) (Thursday, March 2)

Jump to: navigation, search

<- Back to Run Coordination Meetings: Spring 2017 Run

Thursday, March 2

Shift ABU BNA BANU
Day 6.49 0.63 0.88
Swing 6.97 0.32 0.71
Owl 7.09 0.11 0.80
Total 20.55 1.06 2.39


  1. Accelerator Status over the last 24 hrs
  2. Hall-D/GlueX items
    • In the last 24 hours:
      • Production data taken after 10:30 AM Weds.
      • Long mode run
      • Black spots on diamonds
      • Total triggers collected during last period: 3099M
      • Run Statistics Spread Sheet
      • Current Total: 40.05B
  3. Issues
    • Problems with FCAL crate 9
    • FCAL red light issue
    • TRD gas issue
    • DAQ issues:
      • 5:42 - The DAQ keeps giving us "SEBO: Client has not reported for xx sec." errors, but then recovers after a minute. This happens every ~20mins or so. We will restart the DAQ again after the current run finishes.
      • ~22:00 - Monitoring stops working, have to start/stop runs several times to get events flowing through secondary ET
  4. Monitoring
  5. Run Plan
    • Production
    • Triggers: In-time random? Min-bias? FCAL+BCAL+ST?
  6. Offline Analysis
    • TAC runs?
  7. AOB

Friday, March 3

  1. Accelerator Status over the last 24 hrs
    • Vacuum issues
    • Strip charts:
  2. Hall-D/GlueX items
    • Tagger/SC trigger
    • In the last 24 hours:
      • Total triggers collected during last period: M
      • Run Statistics Spread Sheet
      • Current Total: B
  3. Issues
    • Red lines on run control GUI
  4. Monitoring
  5. Run Plan
    • Production
    • New trigger implemented?
    • fADC250 Compressed Mode?
    • Next week:
      • High rate run [500 nA]
      • Low rate run [50 nA + 2x10^-5 RL Al]
  6. Offline Analysis
    • TAC runs?
  7. AOB