Difference between revisions of "Run Planning Meeting Notes, Mar 7 - Mar 13, 2019"

From GlueXWiki
Jump to: navigation, search
(Friday, Mar. 8 at 08:45)
Line 11: Line 11:
 
== Friday, Mar. 8 at 08:45 ==
 
== Friday, Mar. 8 at 08:45 ==
 
# Past 24 hours:
 
# Past 24 hours:
#* Good progress on beam restoration
+
#* [https://logbooks.jlab.org/entry/3664489 Target filled] (1h)
# Issues
+
#* Beam restoration
# Reports:
+
#* [https://logbooks.jlab.org/entry/3664551 Beam convergence]
#* Online monitoring
+
# Issues:
 +
#* [https://logbooks.jlab.org/entry/3664584 Work on CDC/FDC gas system]
 +
# Reports
 
# Today (Friday):
 
# Today (Friday):
 
#* Collimator scan (Hovanes)
 
#* Collimator scan (Hovanes)
 
#* Trigger studies? (Sasha)
 
#* Trigger studies? (Sasha)
 +
#* Production: 200nA, Al 10<sub>-4</sub>
  
 
== Thursday, Mar. 7 at 08:45 ==
 
== Thursday, Mar. 7 at 08:45 ==

Revision as of 09:32, 8 March 2019


Friday, Mar. 8 at 08:45

  1. Past 24 hours:
  2. Issues:
  3. Reports
  4. Today (Friday):
    • Collimator scan (Hovanes)
    • Trigger studies? (Sasha)
    • Production: 200nA, Al 10-4

Thursday, Mar. 7 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Reports:
  4. Today (Thursday):
    • Walk-Through (Elton)
    • Lock up (noon?)
    • Swing shift on standby
    • Accelerator restoration progressing, 11.2GeV beam expected during owl shift
    • Beam restoration, step 1 (Hovanes)
    • Empty target run?