Run Planning Meeting Notes, Mar 7 - Mar 13, 2019

From GlueXWiki
Revision as of 14:49, 8 March 2019 by Aaustreg (Talk | contribs)

Jump to: navigation, search


Monday, Mar. 11 at 08:45

  1. Past 72 hours:
    • Beam restoration
  2. Issues:
  3. Reports
  4. Today (Monday): Beam Studies
    • Access: Tim, ...
    • Resume production


Friday, Mar. 8 at 08:45

  1. Past 24 hours:
  2. Issues:
  3. Reports
  4. Today (Friday):
    • Collimator scan (Hovanes)
    • Trigger studies? (Sasha)
    • Production: 200nA, Al 10-4

Thursday, Mar. 7 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Reports:
  4. Today (Thursday):
    • Walk-Through (Elton)
    • Lock up (noon?)
    • Swing shift on standby
    • Accelerator restoration progressing, 11.2GeV beam expected during owl shift
    • Beam restoration, step 1 (Hovanes)
    • Empty target run?