= Wednesday, March 13 2024=
 
= Wednesday, March 13 2024=
 
=== Past 24 hours ===
 
=== Past 24 hours ===
* Yesterday was efficient  
+
* Yesterday was efficient (15.5h ABU)
 
** Photon beam was established and test of the GEM-TRD and GEM started.
 
** Photon beam was established and test of the GEM-TRD and GEM started.
 
** Rapid-access between noon and 14:00 to look at GEM-TRD and GEM.
 
** Rapid-access between noon and 14:00 to look at GEM-TRD and GEM.
Line 13: Line 13:
  
  
* ABUs: h
+
* ABUs: 15.5 h
 
<!-- * Data Summary:  B triggers on empty target -->
 
<!-- * Data Summary:  B triggers on empty target -->
  

Revision as of 08:21, 13 March 2024

Wednesday, March 13 2024

Past 24 hours

  • Yesterday was efficient (15.5h ABU)
    • Photon beam was established and test of the GEM-TRD and GEM started.
    • Rapid-access between noon and 14:00 to look at GEM-TRD and GEM.
    • Beam back only at 16:40 due to Hall D magnet ramp issue.
    • 20:05-20:25 Tagger magnet trip/restoration


  • ABUs: 15.5 h

Issues

  • Amo radiator/harp motor. (Access today to investigate it)


Questions

  • Man shifts for Friday swing?

Plan

Tuesday, March 12 2024

Past 24 hours

  • 6:37 LCW fluctuation tripped PS magnet.
  • Hall C pass change completed early afternoon. Then, Ops started to tune hall D beam.
  • 17:30 Ops starting to tune beam to Hall D tagger.
  • 23:30 Although the first amorphous radiator motion was normal, it got stuck in its way to get retracted.
    • Hovanes reduced motor speed to 30% of nominal
    • We decided to drop the program on 10-4 and 3×10-4 RL radiators, as well as Ion Chambers threshold calib. on those. We also drop the plan for our Harp scan since it uses the same motor.
  • 01:05 radiator motion issue again despite reduced speed
  • 03:20 Ion Chamber calibration done (2×10-5 radiator only because of motor issue)
  • 05:20 Active Collimator calibration done (high gain only because of radiator motor issue)
  • Transmission looks decent: 5kHz rate in the PSC counters compared to expected 8.7kHz for optimal, converging, beam (100 nA, 2×10-5 RL 750um TPOL converter)



  • ABUs: 0 h

Issues


Questions

    • Access to tagger today or Wednesday to look at amorphous radiator/harp motor?
    • Man shifts for Friday day/swing?