Difference between revisions of "Run Planning Meeting Notes, March 15 - March 22, 2023"

From GlueXWiki
Jump to: navigation, search
(Shift Summaries)
(Reports)
 
(7 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count]
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count]
 
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]
 
[https://logbooks.jlab.org/book/hdlog Hall D Logbook]
 +
 +
==Monday March 20==
 +
===Past 72 hours===
 +
 +
===Shift Summaries===
 +
 +
* [https://logbooks.jlab.org/entry/4150537 Friday day shift]
 +
* [https://logbooks.jlab.org/entry/4150706 Friday swing shift]
 +
* [https://logbooks.jlab.org/entry/4150816 Friday owl shift]
 +
* [https://logbooks.jlab.org/entry/4151420 Saturday early riser shift]
 +
* [https://logbooks.jlab.org/entry/4151513 Saturday day shift]
 +
* [https://logbooks.jlab.org/entry/4151609 Saturday swing shift]
 +
* [https://logbooks.jlab.org/entry/4151684 Saturday owl shift]
 +
* [https://logbooks.jlab.org/entry/4151756 Sunday early riser shift]
 +
* [https://logbooks.jlab.org/entry/4151847 Sunday day shift]
 +
* [https://logbooks.jlab.org/entry/4151948 Sunday swing shift]
 +
* [https://logbooks.jlab.org/entry/4152032 Sunday owl shift]
 +
* [https://logbooks.jlab.org/entry/4152110 Monday early riser shift]
 +
 +
===Reports===
 +
 +
* [https://logbooks.jlab.org/entry/4150942 omega yields at 900nA] -- Justin
 +
* [https://logbooks.jlab.org/entry/4151580 TAGM bunch time structure] -- Hovanes
 +
* [https://logbooks.jlab.org/entry/4151946 occasional rapid access for tending PS test setup] -- Sasha
 +
* [https://logbooks.jlab.org/entry/4151955 TAGM ccdb fiber_quality table error corrected] -- Richard
 +
* End of run plan executed:
 +
*# solenoid ramp-down started 14:10
 +
*# raw mode data collected during ramp-down
 +
*# many fdc current trips, understood these were expected
 +
*# solenoid ramp-down completed at 18:40 -- earlier than expected?
 +
*# current reduced to 50nA, still seeing fdc trips
 +
*# straight track runs taken in both raw mode and regular mode
 +
*# straight track run plan completed, continued taking straight-track data in mode 9
 +
*# beam taken away by MCC as planned at 6:00
 +
*# target shutdown initiated at 6:15
 +
 +
===Issues===
 +
 +
* [https://logbooks.jlab.org/entry/4151502 occasional y position instability]
 +
* [https://logbooks.jlab.org/entry/4151513 occasional daq problems, experts consulted]
 +
* [https://logbooks.jlab.org/entry/4151529 TOF sector HV dropped w/o alarm, recovered]
 +
* [https://logbooks.jlab.org/entry/4151570 DIRC tile temperature alarms]
 +
 +
===Plans===
 +
 +
* [https://logbooks.jlab.org/entry/4151011 straight track running plan] -- completed
 +
* BCAL LED calibration data collection -- underway
 +
* cosmic data collection -- after BCAL LED runs plan completed
 +
 
==Friday March 17==
 
==Friday March 17==
 
===Past 24 hours===
 
===Past 24 hours===
Line 16: Line 65:
 
===Shift Summaries===
 
===Shift Summaries===
  
* []
+
* [https://logbooks.jlab.org/entry/4150016 Thursday day shift]
 +
* [https://logbooks.jlab.org/entry/4150177 Thursday swing shift]
 +
* [https://logbooks.jlab.org/entry/4150335 Thursday owl shift]
 +
* [https://logbooks.jlab.org/entry/4150419 Friday early riser shift]
  
 
===Reports===
 
===Reports===
Line 73: Line 125:
 
===Shift Summaries===
 
===Shift Summaries===
  
* [https://logbooks.jlab.org/entry/4149895 early riser shift]
+
* [https://logbooks.jlab.org/entry/4150016 Wednesday day shift]
* [https://logbooks.jlab.org/entry/4150016 day shift]
+
* [https://logbooks.jlab.org/entry/4150177 Wednesday swing shift]
* [https://logbooks.jlab.org/entry/4150177 swing shift]
+
* [https://logbooks.jlab.org/entry/4150335 Wednesday owl shift]
 +
* [https://logbooks.jlab.org/entry/4149895 Thursday early riser shift]
  
 
===Reports===
 
===Reports===

Latest revision as of 07:13, 20 March 2023

Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394 MCC Whiteboard Hall D counting room white board Spreadsheet with list of runs Integrated Trigger Count Hall D Logbook

Monday March 20

Past 72 hours

Shift Summaries

Reports

Issues

Plans

  • straight track running plan -- completed
  • BCAL LED calibration data collection -- underway
  • cosmic data collection -- after BCAL LED runs plan completed

Friday March 17

Past 24 hours

  • Dropped to RESTRICTED for tours at 3:45pm 3/16
    • Temperature in the hall rose to >77 degrees, recovered in time
    • Visits ended by 7:00pm
    • Hall D swept and requested beam restoration
    • Started off with new harp scans, then continued production
  • Beam accounting point of interest: tour down was counted as BANU

Shift Summaries

Reports

Issues

  • Parsing issue with rocBCAL7 (rocID=37 and slot=16), recovered by power cycling rocbcal7
  • TAGM column 16, fadc250 stopped counting in middle of run around noon, run ended, recovered by power cycling roctagm1
  • Problem writing raw data to tape resolved, transfer to tape resumed
  • Issue writing to local disk blocked DAQ during 121161, resolved by Sergey and running resumed
  • Lockup of fcal bases continues regularly, resolved by reset procedure at the end of run (or sometimes on its own!)
  • Problems with radiator harp scans happened again, resolved by Hovanes restarting IOC, https://logbooks.jlab.org/entry/4150880 working again at 9:45pm]
  • Coherent edge (blue points) on CBREM gui spectrum not updating, work-around by bringing up separate fit tool

Plans

  • Another high current run at 900 nA during the day today?
  • Continue running production
  • Straight-track run ~50nA
    • planned for March 19th Sunday swing
    • magnetic field ramped down
    • access not required
    • people to contact: Justin, Sasha, Lubomir, Naomi
  • After beam goes away, one shift of BCAL LED data requsted -- Mark Dalton, Varun

Plans on Accelerator Side

  • Hall C running continues, no apparent issues that might interrupt them before Monday

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday March 16

Past 24 hours

  • Tagger Hall Access requested by Hovanes
    • came as a surprise to RADCON and MCC crew
    • discussion during the 8:00 meeting
    • we can do better
  • High current run(900 nA)
    • initially blocked by Crew Chief -- discussed at 8:00 meeting
    • eventually granted after some delay
    • main participants Justin, Sasha, Lubomir, Naomi
    • trigger conditions eventually found that allow running at 75kHz data rate @ 900nA [3][4]

Shift Summaries

Reports

Issues

Plans

  • Continue running production
  • Visitors tour of Hall D starts at 4:45pm 3/16
    • Data collection should end sometime after 4:00pm, when convenient before 4:20
    • Contact MCC and ask to drop Hall D to RESTRICTED, tagger hall not affected
    • Ask them to contact RADCON to sweep Hall D for the visit
    • Visit should end by 6:45pm
    • As soon as they leave, put Hall D back in Power Permit and request beam restoration
    • Start off with new harp scans, then continue production
  • Straight-track run ~50nA
    • planned for March 19th Sunday swing
    • magnetic field ramped down
    • access not required
    • people to contact: Justin, Sasha, Lubomir, Naomi

Plans on Accelerator Side

  • Hall C running continues, no apparent issues that might interrupt them before Monday

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)