Line 7: Line 7:
 
==Thursday March 16==
 
==Thursday March 16==
 
===Past 24 hours===
 
===Past 24 hours===
* Tagger Hall Access (March 15) by Hovanes(After the Hall is surveyed and gets into controlled access)  
+
* Tagger Hall Access requested by Hovanes
* High current run(900 nA)[High intensity scan:Final round] with modified trigger thresh-holds[Wednesday swing/Thursday day Shift][Justin, Sasha, Lubomir, Naomi][Access not required]
+
** came as a surprise to RADCON and MCC crew
 +
** discussion during the 8:00 meeting
 +
** we can do better  
 +
* High current run(900 nA)
 +
** initially blocked by Crew Chief -- discussed at 8:00 meeting
 +
** eventually granted after some delay
 +
** main participants Justin, Sasha, Lubomir, Naomi
 +
** trigger conditions eventually found that allow running at 75kHz data rate @ 900nA
 
<!--  
 
<!--  
 
*production continues, start of the day shift:injector orbit optimization issue, trippy beam, beam lost: BLM trips, TAGH HV alarms, production smooth over the night. No beam at this time take for wednesday.
 
*production continues, start of the day shift:injector orbit optimization issue, trippy beam, beam lost: BLM trips, TAGH HV alarms, production smooth over the night. No beam at this time take for wednesday.
 
*ABU=13.58 hr(Wednesday morning upto 8 am)
 
*ABU=13.58 hr(Wednesday morning upto 8 am)
 
-->
 
-->
 +
 
===Shift Reports===
 
===Shift Reports===
 
<!--
 
<!--

Revision as of 08:43, 16 March 2023

Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394 MCC Whiteboard Hall D counting room white board Spreadsheet with list of runs Integrated Trigger Count Hall D Logbook

Thursday March 16

Past 24 hours

  • Tagger Hall Access requested by Hovanes
    • came as a surprise to RADCON and MCC crew
    • discussion during the 8:00 meeting
    • we can do better
  • High current run(900 nA)
    • initially blocked by Crew Chief -- discussed at 8:00 meeting
    • eventually granted after some delay
    • main participants Justin, Sasha, Lubomir, Naomi
    • trigger conditions eventually found that allow running at 75kHz data rate @ 900nA

Shift Reports

Reports

Issues

Plans

  • Continue running production
  • Visitors tour of Hall D starts at 4:45pm 3/16
    • Data collection should end sometime after 4:00pm, when convenient before 4:20
    • Contact MCC and ask to drop Hall D to RESTRICTED, tagger hall not affected
    • Ask them to contact RADCON to sweep Hall D for the visit
    • Visit should end by 6:45pm
    • As soon as they leave, put Hall D back in Power Permit and request beam restoration
    • Start off with new harp scans, then continue production
  • Straight-track run ~50nA
    • planned for March 19th Sunday swing
    • magnetic field ramped down
    • access not required
    • people to contact: Justin, Sasha, Lubomir, Naomi

Plans on Accelerator Side

  • Hall C running continues, no apparent issues that might interrupt them before Monday

Regular Production Cycle

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)