(Friday, March 25)
(Friday, March 25)
Line 7: Line 7:
 
## magnet schedule
 
## magnet schedule
 
##* [https://mailman.jlab.org/pipermail/halld/2016-March/000374.html Lubomir proposal]
 
##* [https://mailman.jlab.org/pipermail/halld/2016-March/000374.html Lubomir proposal]
## [[media:Quadrupolestudy-3-25-2015.pdf:tagger|quadrupole commissioning study]]
+
## [[media:Quadrupolestudy-3-25-2016.pdf:tagger|quadrupole commissioning study]]
 
## pedestal adjustment?
 
## pedestal adjustment?
 
## other systems?
 
## other systems?

Revision as of 08:47, 25 March 2016

Friday, March 25

  1. Accelerator Status
    1. start-up Monday day shift
    2. run extension, through April 25
  2. Work in Hall
    1. magnet schedule
    2. quadrupole commissioning study
    3. pedestal adjustment?
    4. other systems?
  3. Run Plan on startup
  4. Offline analysis?
  5. Next meeting?
  6. AOB?

Thursday, March 24

No meeting

Wednesday, March 23

  1. Accelerator Status
    1. start-up Friday
  2. Work in Hall
    1. FCAL HV Adjustment Adesh
    2. FCAL Bases Replacement [Adesh & Jon]
    3. tagger quadrupole commissioning[?]
    4. Tagger Hall exterior door, default state of mechanical lock
  3. Offline analysis?
  4. Run Plan on startup
  5. Next meeting?
  6. AOB?

Tuesday, March 22

No meeting

Monday, March 21

  1. Accelerator Status
    • Leak found
    • Shifts canceled through Tuesday, on standby Wed. and Thu.
  2. Work in Hall
    • Green button (Elton)
    • One more tagger hall key?
    • Other subsystems
    • Notify the RC in advance
  3. Offline analysis?
  4. Run Plan on startup
  5. Next meeting?
  6. AOB?