Difference between revisions of "Run Planning Meeting Notes, March 20-26, 2016"

From GlueXWiki
Jump to: navigation, search
(Monday, March 28)
(Monday, March 28)
Line 7: Line 7:
 
## Hall D can ask for beam (beam on now), but may be taken away for extraction work
 
## Hall D can ask for beam (beam on now), but may be taken away for extraction work
 
# Hall-D/GlueX items
 
# Hall-D/GlueX items
 +
## beam issues
 +
##* drifting y-position
 +
##* left should in y in tagger harp scan
 +
##* satelite bump in beam profiler still there, plus new wart on main peak of x
 +
##* active target counting rate low
 
## magnet ramping now...done by 2 pm
 
## magnet ramping now...done by 2 pm
 
## [https://mailman.jlab.org/pipermail/halld/2016-March/000374.html Lubomir proposal], executed overnight last night
 
## [https://mailman.jlab.org/pipermail/halld/2016-March/000374.html Lubomir proposal], executed overnight last night

Revision as of 08:44, 28 March 2016

Monday, March 28

  1. Accelerator Status
    1. started beam delivery Sunday
    2. today: Hall B 1-pass extraction work will interrupt beam availability
    3. Hall A Moller quads need work, target filling, some viewer broken
    4. Hall D can ask for beam (beam on now), but may be taken away for extraction work
  2. Hall-D/GlueX items
    1. beam issues
      • drifting y-position
      • left should in y in tagger harp scan
      • satelite bump in beam profiler still there, plus new wart on main peak of x
      • active target counting rate low
    2. magnet ramping now...done by 2 pm
    3. Lubomir proposal, executed overnight last night
    4. quadrupole commissioning study
    5. FCAL field dependence study data being taken now (Adesh)
    6. pair spectrometer study while ramping?
    7. other systems?
  3. Run Plan
  4. Offline analysis?
  5. Next meeting?
  6. AOB?

Friday, March 25

  1. Accelerator Status
    1. start-up Monday day shift
    2. run extension, through April 25
  2. Work in Hall
    1. magnet schedule
    2. quadrupole commissioning study
    3. pedestal adjustment?
    4. other systems?
  3. Run Plan on startup
  4. Offline analysis?
  5. Next meeting?
  6. AOB?

Thursday, March 24

No meeting

Wednesday, March 23

  1. Accelerator Status
    1. start-up Friday
  2. Work in Hall
    1. FCAL HV Adjustment Adesh
    2. FCAL Bases Replacement [Adesh & Jon]
    3. tagger quadrupole commissioning[?]
    4. Tagger Hall exterior door, default state of mechanical lock
  3. Offline analysis?
  4. Run Plan on startup
  5. Next meeting?
  6. AOB?

Tuesday, March 22

No meeting

Monday, March 21

  1. Accelerator Status
    • Leak found
    • Shifts canceled through Tuesday, on standby Wed. and Thu.
  2. Work in Hall
    • Green button (Elton)
    • One more tagger hall key?
    • Other subsystems
    • Notify the RC in advance
  3. Offline analysis?
  4. Run Plan on startup
  5. Next meeting?
  6. AOB?