Difference between revisions of "Run Planning Meeting Notes, March 20-26, 2016"

From GlueXWiki
Jump to: navigation, search
(Monday, March 21)
 
(21 intermediate revisions by 3 users not shown)
Line 1: Line 1:
 +
==Satruday, March 26==
 +
 +
No meeting.
 +
 +
==Friday, March 25==
 +
 +
# Accelerator Status
 +
## start-up Monday day shift
 +
## run extension, through April 25
 +
# Work in Hall
 +
## magnet schedule
 +
##* [https://mailman.jlab.org/pipermail/halld/2016-March/000374.html Lubomir proposal]
 +
## [[media:Quadrupolestudy-3-25-2016.pdf|quadrupole commissioning study]]
 +
## pedestal adjustment?
 +
## other systems?
 +
# Run Plan on startup
 +
# Offline analysis?
 +
# Next meeting?
 +
# AOB?
 +
 +
== Thursday, March 24 ==
 +
 +
No meeting
 +
 
==Wednesday, March 23==
 
==Wednesday, March 23==
  
 
# Accelerator Status
 
# Accelerator Status
 +
## start-up Friday
 
# Work in Hall
 
# Work in Hall
 +
## FCAL HV Adjustment [https://logbooks.jlab.org/entry/3391812 Adesh]
 +
## FCAL Bases Replacement [Adesh & Jon]
 +
## tagger quadrupole commissioning[?]
 +
## Tagger Hall exterior door, default state of mechanical lock
 
# Offline analysis?
 
# Offline analysis?
 
# Run Plan on startup
 
# Run Plan on startup
Line 26: Line 55:
 
# Next meeting?
 
# Next meeting?
 
# AOB?
 
# AOB?
 +
 +
==Sunday, March 20==
 +
 +
No meeting.

Latest revision as of 16:46, 29 March 2016

Satruday, March 26

No meeting.

Friday, March 25

  1. Accelerator Status
    1. start-up Monday day shift
    2. run extension, through April 25
  2. Work in Hall
    1. magnet schedule
    2. quadrupole commissioning study
    3. pedestal adjustment?
    4. other systems?
  3. Run Plan on startup
  4. Offline analysis?
  5. Next meeting?
  6. AOB?

Thursday, March 24

No meeting

Wednesday, March 23

  1. Accelerator Status
    1. start-up Friday
  2. Work in Hall
    1. FCAL HV Adjustment Adesh
    2. FCAL Bases Replacement [Adesh & Jon]
    3. tagger quadrupole commissioning[?]
    4. Tagger Hall exterior door, default state of mechanical lock
  3. Offline analysis?
  4. Run Plan on startup
  5. Next meeting?
  6. AOB?

Tuesday, March 22

No meeting

Monday, March 21

  1. Accelerator Status
    • Leak found
    • Shifts canceled through Tuesday, on standby Wed. and Thu.
  2. Work in Hall
    • Green button (Elton)
    • One more tagger hall key?
    • Other subsystems
    • Notify the RC in advance
  3. Offline analysis?
  4. Run Plan on startup
  5. Next meeting?
  6. AOB?

Sunday, March 20

No meeting.