(Thursday, May 3 at 08:45)
(Thursday, May 3 at 08:45)
Line 10: Line 10:
 
#* RF Recovery and Tour: scheduled from 9:00-15:00 but RF recovery took at least until 17:00
 
#* RF Recovery and Tour: scheduled from 9:00-15:00 but RF recovery took at least until 17:00
 
#* Hall A pass change (several h)
 
#* Hall A pass change (several h)
#* Network problems on accelerator site
+
#* Network problems on accelerator site: https://logbooks.jlab.org/entry/3571038
 
#* Harp Scan
 
#* Harp Scan
 
#* Production running
 
#* Production running

Revision as of 21:33, 2 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, May 3 at 08:45

  1. Notes from the previous 24 hours:
    • RF Recovery and Tour: scheduled from 9:00-15:00 but RF recovery took at least until 17:00
    • Hall A pass change (several h)
    • Network problems on accelerator site: https://logbooks.jlab.org/entry/3571038
    • Harp Scan
    • Production running
  2. Issues:
  3. Reports:
  4. Run Plan
    • Thursday
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Friday
      • Production
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run
    • Week 17
  5. AOB