Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, May 3 at 08:45)
(Thursday, May 3 at 08:45)
Line 16: Line 16:
 
# Reports:
 
# Reports:
 
# Run Plan
 
# Run Plan
#*Thursday
+
#*Thursday/Friday
 
#**Fast raster scan (9am, 60min)
 
#**Fast raster scan (9am, 60min)
 
#**TAC run (10am, 1 shift)
 
#**TAC run (10am, 1 shift)
#*Friday
 
#**Production
 
 
#*Saturday
 
#*Saturday
 
#** Production
 
#** Production

Revision as of 08:36, 3 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, May 3 at 08:45

  1. Notes from the previous 24 hours:
    • RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00
    • Planned Hall A pass change (several h)
    • Network problems on accelerator site: [1][2][3]
    • Harp Scan
    • Production running
  2. Issues:
  3. Reports:
  4. Run Plan
    • Thursday/Friday
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run
    • Week 17
  5. AOB