Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, May 3 at 08:45)
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Friday, May 4 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#* Network problems on accelerator site, RF recovery, Hall A pass change
 +
#* Beam back expected at 8pm
 +
#* Harp Scan
 +
#* Raw mode run
 +
#* Production running
 +
#Issues:
 +
# Reports:
 +
# Run Plan
 +
#*Friday
 +
#**Fast raster scan (9am, 60min)
 +
#**TAC run (10am, 1 shift)
 +
#*Saturday
 +
#** Production
 +
#*Sunday
 +
#** 5am end of physics, 6am end of run, restricted access from 10am
 +
#*[https://halldweb.jlab.org/wiki/images/5/5f/Spring18_week17.jpg Week 17]
 +
# AOB
 +
  
 
== Thursday, May 3 at 08:45 ==
 
== Thursday, May 3 at 08:45 ==

Revision as of 09:37, 3 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, May 4 at 08:45

  1. Notes from the previous 24 hours:
    • Network problems on accelerator site, RF recovery, Hall A pass change
    • Beam back expected at 8pm
    • Harp Scan
    • Raw mode run
    • Production running
  2. Issues:
  3. Reports:
  4. Run Plan
    • Friday
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run, restricted access from 10am
    • Week 17
  5. AOB


Thursday, May 3 at 08:45

  1. Notes from the previous 24 hours:
    • RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00
    • Planned Hall A pass change (several h)
    • Network problems on accelerator site: [1][2][3]
    • Harp Scan
    • Production running
  2. Issues:
  3. Reports:
    • Yields w/o W foil: [4]
  4. Run Plan
    • Thursday/Friday
      • Raw mode run
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run
    • Week 17
  5. AOB