Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"
From GlueXWiki
(→Friday, May 4 at 08:45) |
|||
Line 8: | Line 8: | ||
== Friday, May 4 at 08:45 == | == Friday, May 4 at 08:45 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | #* Network problems on accelerator site, RF recovery, Hall A pass change | + | #* Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change |
#* Beam back expected at 8pm | #* Beam back expected at 8pm | ||
#* Harp Scan | #* Harp Scan | ||
Line 25: | Line 25: | ||
#*[https://halldweb.jlab.org/wiki/images/5/5f/Spring18_week17.jpg Week 17] | #*[https://halldweb.jlab.org/wiki/images/5/5f/Spring18_week17.jpg Week 17] | ||
# AOB | # AOB | ||
− | |||
== Thursday, May 3 at 08:45 == | == Thursday, May 3 at 08:45 == |
Revision as of 14:17, 3 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, May 4 at 08:45
- Notes from the previous 24 hours:
- Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
- Beam back expected at 8pm
- Harp Scan
- Raw mode run
- Production running
- Issues:
- Reports:
- Run Plan
- Friday
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Saturday
- Production
- Sunday
- 5am end of physics, 6am end of run, restricted access from 10am
- Week 17
- Friday
- AOB