Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"
From GlueXWiki
(→Friday, May 4 at 08:45) |
(→Friday, May 4 at 08:45) |
||
Line 15: | Line 15: | ||
#Issues: | #Issues: | ||
# Reports: | # Reports: | ||
+ | #* ω yields w/o W foil [https://logbooks.jlab.org/entry/3571417] | ||
# Run Plan | # Run Plan | ||
#*Friday | #*Friday |
Revision as of 15:39, 3 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, May 4 at 08:45
- Notes from the previous 24 hours:
- Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
- Beam back expected at 8pm
- Harp Scan
- Raw mode run
- Production running
- Issues:
- Reports:
- ω yields w/o W foil [1]
- Run Plan
- Friday
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Saturday
- Production
- Sunday
- 5am end of physics, 6am end of run, restricted access from 10am
- Week 17
- Friday
- AOB