(Thursday, May 3 at 08:45)
(Friday, May 4 at 08:45)
Line 9: Line 9:
 
# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 
#* Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
 
#* Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
#* Beam back expected at 8pm
+
#* CW beam back at 9pm
 
#* Harp Scan
 
#* Harp Scan
 
#* Raw mode run
 
#* Raw mode run

Revision as of 22:04, 3 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Friday, May 4 at 08:45

  1. Notes from the previous 24 hours:
    • Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
    • CW beam back at 9pm
    • Harp Scan
    • Raw mode run
    • Production running
  2. Issues:
  3. Reports:
    • ω yields w/o W foil [1]
  4. Run Plan
    • Friday
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run, restricted access from 10am
    • Week 17
  5. AOB

Thursday, May 3 at 08:45

  1. Notes from the previous 24 hours:
    • RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00
    • Planned Hall A pass change (several h)
    • Network problems on accelerator site: [2][3][4]
    • Harp Scan
    • Production running
  2. Issues:
  3. Reports:
    • ρ yields w/o W foil: [5]
  4. Run Plan
    • Thursday/Friday
      • Raw mode run
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run
    • Week 17
  5. AOB