Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"

From GlueXWiki
Jump to: navigation, search
(Saturday, May 5 at 08:45 (no meeting))
Line 5: Line 5:
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York  Run Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar]
 +
 +
== Monday, May 7 at 08:45 ==
 +
# Notes from the previous 24 hours:
 +
#* 5am end of physics, 6am end of run, restricted access from 10am
 +
#Shutdown: [https://logbooks.jlab.org/entry/3573898][https://logbooks.jlab.org/entry/3573891][https://logbooks.jlab.org/entry/3573890]
 +
#Issues:
 +
#* raw files are not copied to tape (David informed, [https://logbooks.jlab.org/entry/3573140 fixed])
 +
#* rootspy troubles [https://logbooks.jlab.org/entry/3573089]
 +
#* beam/halo monitor trips
 +
#* new holes in FCAL monitor [https://logbooks.jlab.org/entry/3573237]
 +
# Reports:
 +
#* Trigger counter passed 150B events [https://logbooks.jlab.org/entry/3573437]
 +
#* PS acceptance from TAC run [https://logbooks.jlab.org/entry/3572691]
 +
#*[https://halldweb.jlab.org/wiki/images/5/5f/Spring18_week17.jpg Week 17]
 +
# AOB
  
 
== Saturday, May 5 at 08:45 (no meeting) ==
 
== Saturday, May 5 at 08:45 (no meeting) ==

Revision as of 10:31, 6 May 2018

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Monday, May 7 at 08:45

  1. Notes from the previous 24 hours:
    • 5am end of physics, 6am end of run, restricted access from 10am
  2. Shutdown: [1][2][3]
  3. Issues:
    • raw files are not copied to tape (David informed, fixed)
    • rootspy troubles [4]
    • beam/halo monitor trips
    • new holes in FCAL monitor [5]
  4. Reports:
    • Trigger counter passed 150B events [6]
    • PS acceptance from TAC run [7]
    • Week 17
  5. AOB

Saturday, May 5 at 08:45 (no meeting)

  1. Notes from the previous 24 hours:
  2. Issues:
    • RootSpy plots do not appear on plot browser (David informed, fixed)
    • raw files are not copied to tape (David informed, fixed)
    • rootspy troubles [12]
    • beam/halo monitor trips
    • new holes in FCAL monitor [13]
  3. Reports:
    • Trigger counter passed 150B events [14]
    • PS acceptance from TAC run [15]
  4. Run Plan
    • Saturday
      • Production
      • Fast raster during swing shift (Michael, Richard): denied by crew chief, considered too risky with Michael on vacation and Richard off-site
      • Trigger tests (Sasha): 9pm - 3am, trigger efficiency with ST, test with TOF trigger [16]
    • Sunday
      • 5am end of physics, 6am end of run, restricted access from 10am
      • Magnet Shutdown [17]
      • Calorimeter Shutdown [18]
      • FDC Shutdown [19]
    • Week 17
  5. AOB

Friday, May 4 at 08:45

  1. Notes from the previous 24 hours:
    • Network problems on accelerator site, CHL1 trip, RF recovery, Hall A pass change
    • 1h cosmic run
    • CW beam back at 9pm
    • Harp Scan [20], [21], [22], [23], [24]
    • Raw mode runs #042510(wrong position on AC), #042511
    • Production running: 0.8B triggers
  2. Issues:
    • DAQ not starting, needed reboot of rocTRIG2
    • MCC corrected beam position on AC
    • RootSpy not starting, xMsg server reset [25]
  3. Reports:
    • Effect of W-foil on CDC hit multiplicity [26]
    • ω yields w/o W foil [27]
    • R. Jones tested gain setting on AC
    • Transmission rate: [28]
  4. Run Plan
    • Friday
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run, restricted access from 10am
    • Week 17
  5. AOB

Thursday, May 3 at 08:45

  1. Notes from the previous 24 hours:
    • RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00
    • Planned Hall A pass change (several h)
    • Network problems on accelerator site: [29][30][31]
    • Harp Scan
    • Production running
  2. Issues:
  3. Reports:
    • ρ yields w/o W foil: [32]
  4. Run Plan
    • Thursday/Friday
      • Raw mode run
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run
    • Week 17
  5. AOB