Run Planning Meeting Notes, May 2-May 6, 2018

From GlueXWiki
Revision as of 09:20, 3 May 2018 by Aaustreg (Talk | contribs) (Thursday, May 3 at 08:45)

Jump to: navigation, search

<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run

Thursday, May 3 at 08:45

  1. Notes from the previous 24 hours:
    • RF Recovery and Tour: scheduled from 9:00-15:00, but RF recovery estimated until 17:00
    • Planned Hall A pass change (several h)
    • Network problems on accelerator site: [1][2][3]
    • Harp Scan
    • Production running
  2. Issues:
  3. Reports:
    • Yields w/o W foil: [4]
  4. Run Plan
    • Thursday/Friday
      • Raw mode run
      • Fast raster scan (9am, 60min)
      • TAC run (10am, 1 shift)
    • Saturday
      • Production
    • Sunday
      • 5am end of physics, 6am end of run
    • Week 17
  5. AOB