Difference between revisions of "Run Planning Meeting Notes, Nov 1-Nov 8, 2018"

From GlueXWiki
Jump to: navigation, search
Line 13: Line 13:
 
##Rest of time - production
 
##Rest of time - production
 
# Issues
 
# Issues
##Check with Elton re BCAL N/S   
+
#*[https://logbooks.jlab.org/entry/3618692 Shift checklist Qs, from Mark]
 +
#*Check with Elton re BCAL N/S   
 
# Reports
 
# Reports
 +
#*[https://logbooks.jlab.org/entry/3618696 CDC background analysis, from Sergey]
 
#*[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet]
 
#*[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet]
 
# Plans
 
# Plans

Revision as of 20:54, 31 October 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Thursday, Nov 1 at 08:45

  1. Last 24h
    1. 7GeV test run completed
    2. Raw mode run completed
    3. Rest of time - production
  2. Issues
  3. Reports
  4. Plans
  5. AOB