(Thursday, Nov 1 at 08:45)
(Thursday, Nov 1 at 08:45)
Line 11: Line 11:
 
#*7GeV coherent peak test run completed
 
#*7GeV coherent peak test run completed
 
#*Raw mode run completed
 
#*Raw mode run completed
#*Rest of time - production
+
#*BCAL LED run for Elton when beam went off
 +
#*Rest of time - mostly production
 
#* Approx 9pm the tagger chain dipole (not the Hall D tagger) [https://logbooks.jlab.org/entry/3618918 power supply failed]. Fixed after midnight. Some problems restarting as many beamline counters had tripped apparently without alarms  
 
#* Approx 9pm the tagger chain dipole (not the Hall D tagger) [https://logbooks.jlab.org/entry/3618918 power supply failed]. Fixed after midnight. Some problems restarting as many beamline counters had tripped apparently without alarms  
 
# Issues
 
# Issues
Line 18: Line 19:
 
#*[https://logbooks.jlab.org/entry/3618692 Shift checklist Qs, from Mark]
 
#*[https://logbooks.jlab.org/entry/3618692 Shift checklist Qs, from Mark]
 
#*[https://logbooks.jlab.org/entry/3618565 Elton re BCAL LEDs]   
 
#*[https://logbooks.jlab.org/entry/3618565 Elton re BCAL LEDs]   
 +
#*Is the cosmic production trigger config out of date?
 
# Reports
 
# Reports
 
#*[https://logbooks.jlab.org/entry/3618696 CDC background analysis, from Sergey]
 
#*[https://logbooks.jlab.org/entry/3618696 CDC background analysis, from Sergey]

Revision as of 08:30, 1 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Thursday, Nov 1 at 08:45

  1. Last 24h
    • 7GeV coherent peak test run completed
    • Raw mode run completed
    • BCAL LED run for Elton when beam went off
    • Rest of time - mostly production
    • Approx 9pm the tagger chain dipole (not the Hall D tagger) power supply failed. Fixed after midnight. Some problems restarting as many beamline counters had tripped apparently without alarms
  2. Issues
  3. Reports
  4. Plans
  5. AOB