Thursday, Nov 1 at 08:45

  1. Last 24h
  2. Issues
  3. Reports
  4. Plans
  5. AOB
    • Notes from today's meeting: Hovanes to scan AC early pm.
    • Shifters to call Sasha if beam goes off for >= 1h during weekend daytime, to check BCAL LED trigger diffs between up & down and long & short modes
    • Sasha said shift crew should not use the cosmic trigger at all. Use production trigger even if only to collect cosmics during a long down-time.
    • Plan for V-wire TAC run on Wed next week at 2 PS settings, nominal & lower Eg. Then follow with low Eg test runs. Maybe a 3rd TAC run after the low E data-taking.
    • Q on whether to go ahead w second set of 7GeV test runs - need collaboration agreement
    • Remember to make a plan for the clocks changing on Sunday