Run Planning Meeting Notes, Nov 1-Nov 8, 2018

From GlueXWiki
Revision as of 08:39, 2 November 2018 by Njarvis (Talk | contribs) (Friday, Nov 1 at 08:45)

Jump to: navigation, search

<- Back to Run Coordination Meetings:Fall2018 Run


Friday, Nov 1 at 08:45

  1. Last 24h
    • active collimator scan done. The intention was to make sure that the beam was centered on the collimator and then decide whether to ask for beam convergence adjustment but the results were confusing and we decided to continue running without changes for now.
    • Mark filled both alcohol bubblers
    • Sasha looked at BCAL LED trigger timing - hopefully this is fixed
    • Production - beam trips quite frequent
    • Cleared up some mysteries from yesterday - a network issue was the cause of the beamline counters switching off. It should have triggered an alarm but didn't. And the TagM mess was indeed when the DAQ config was set to cosmics.
  2. Issues
  3. Reports
  4. Plans
    • Production
    • Monday beam studies 0830, ~ 4h ; Tues recovery ~ 8h
    • Tentative plan for V-wire TAC run on Wed next week at 2 PS settings, nominal & lower Eg. Then follow with low Eg test runs. Maybe a 3rd TAC run after the low E data-taking.
    • Q on whether to go ahead w second set of 7GeV test runs - need collaboration agreement
    • Remember to make a plan for the clocks changing on Sunday
    • Schedule for week 7
    • Acc whiteboard
    • Counting house whiteboard
  5. AOB

Thursday, Nov 1 at 08:45

  1. Last 24h
  2. Issues
  3. Reports
  4. Plans
  5. AOB
    • Notes from today's meeting: Hovanes to scan AC early pm.
    • Shifters to call Sasha if beam goes off for >= 1h during weekend daytime, to check BCAL LED trigger diffs between up & down and long & short modes
    • Sasha said shift crew should not use the cosmic trigger at all. Use production trigger even if only to collect cosmics during a long down-time.
    • Tentative plan for V-wire TAC run on Wed next week at 2 PS settings, nominal & lower Eg. Then follow with low Eg test runs. Maybe a 3rd TAC run after the low E data-taking.
    • Q on whether to go ahead w second set of 7GeV test runs - need collaboration agreement
    • Remember to make a plan for the clocks changing on Sunday