Difference between revisions of "Run Planning Meeting Notes, Nov 14-Nov 21, 2018"
From GlueXWiki
m (→Thursday, Nov 15 at 08:45) |
(→Thursday, Nov 15 at 08:45) |
||
Line 21: | Line 21: | ||
#* CBrem gui not fitting | #* CBrem gui not fitting | ||
#* [https://logbooks.jlab.org/entry/3626126 Convergence optimization failed]. [https://logbooks.jlab.org/entry/3626463 Rates after optimization did not show improvement.] | #* [https://logbooks.jlab.org/entry/3626126 Convergence optimization failed]. [https://logbooks.jlab.org/entry/3626463 Rates after optimization did not show improvement.] | ||
+ | #* [https://logbooks.jlab.org/entry/3626469 Beam current has been unusually unstable yesterday] [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367] | ||
#Reports | #Reports | ||
#* [ Monitoring] (Thomas) | #* [ Monitoring] (Thomas) |
Revision as of 06:54, 15 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Low energy running Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 9
- Hall D schedule for week 10
Thursday, Nov 15 at 08:45
- Last 24h:
- Standard production running
- Issues
- CBrem gui not fitting
- Convergence optimization failed. Rates after optimization did not show improvement.
- Beam current has been unusually unstable yesterday [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367]
- Reports
- [ Monitoring] (Thomas)
- Plans
- TAC run this morning/afternoon. With V-wire
- Production running
- Notes