Difference between revisions of "Run Planning Meeting Notes, Nov 14-Nov 21, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, Nov 15 at 08:45)
(Thursday, Nov 15 at 08:45)
Line 19: Line 19:
 
#* Standard production running
 
#* Standard production running
 
#Issues
 
#Issues
#* CBrem gui not fitting  
+
#* [https://logbooks.jlab.org/entry/3626278 CBrem gui not fitting] and [https://logbooks.jlab.org/entry/3626468 the coherent edge has been drifting]. Decided (6am) to stop run on diamond, do Harp scan and continue with amorphous run, then TAC until the problem is fixed.
 
#* [https://logbooks.jlab.org/entry/3626126 Convergence optimization failed]. [https://logbooks.jlab.org/entry/3626463 Rates after optimization did not show improvement.]
 
#* [https://logbooks.jlab.org/entry/3626126 Convergence optimization failed]. [https://logbooks.jlab.org/entry/3626463 Rates after optimization did not show improvement.]
 
#* [https://logbooks.jlab.org/entry/3626469 Beam current has been unusually unstable yesterday] [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367]
 
#* [https://logbooks.jlab.org/entry/3626469 Beam current has been unusually unstable yesterday] [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367]

Revision as of 07:01, 15 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Thursday, Nov 15 at 08:45

  1. Last 24h:
    • Standard production running
  2. Issues
  3. Reports
    • [ Monitoring] (Thomas)
  4. Plans
    • TAC run this morning/afternoon. With V-wire
    • Production running
  5. Notes