Difference between revisions of "Run Planning Meeting Notes, Nov 14-Nov 21, 2018"

From GlueXWiki
Jump to: navigation, search
(Thursday, Nov 15 at 08:45)
(Thursday, Nov 15 at 08:45)
Line 23: Line 23:
 
#* [https://logbooks.jlab.org/entry/3626469 Beam current has been unusually unstable yesterday] [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367]
 
#* [https://logbooks.jlab.org/entry/3626469 Beam current has been unusually unstable yesterday] [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367]
 
#Reports
 
#Reports
#* [ Monitoring] (Thomas)
+
#* [https://logbooks.jlab.org/entry/3626516 Monitoring] (Thomas)
 
#Plans
 
#Plans
#* TAC run this morning/afternoon. With V-wire
+
#* Monday maintenance is moved to today, noon-3/4pm.
 +
#** Access to move back the lump monitor
 +
#** Other access?
 +
#* TAC run this morning/afternoon. With V-wire? Postponed it?
 +
#* Optics adjustment? (Todd/Jay) 30 min.
 
#* Production running
 
#* Production running
 
#Discussion ComCal commissioning
 
#Discussion ComCal commissioning

Revision as of 09:21, 15 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Thursday, Nov 15 at 08:45

  1. Last 24h:
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Monday maintenance is moved to today, noon-3/4pm.
      • Access to move back the lump monitor
      • Other access?
    • TAC run this morning/afternoon. With V-wire? Postponed it?
    • Optics adjustment? (Todd/Jay) 30 min.
    • Production running
  5. Discussion ComCal commissioning
  6. Notes