(Thursday, Nov 15 at 08:45)
(Thursday, Nov 15 at 08:45)
Line 26: Line 26:
 
#* [https://logbooks.jlab.org/entry/3626516 Monitoring] (Thomas)
 
#* [https://logbooks.jlab.org/entry/3626516 Monitoring] (Thomas)
 
#Plans
 
#Plans
#* Monday maintenance is moved to today, noon-3/4pm.  
+
#* Monday maintenance is moved to today, 1pm-4/5pm.
#** Access to move back the lump monitor
+
#* Check V-wire position wrt beam (Sacha).
 +
#* Investigate issue with CBrem gui. Meanwhile, fill the target.
 +
#* Production running, starting with amorphous (for CBrem ref.)
 +
#* Optics adjustment (Todd/Jay) 30 min.
 +
#** Access to move back the flux monitor
 
#** Other access?  
 
#** Other access?  
#* TAC run this morning/afternoon. With V-wire? Postponed it?
+
#* TAC run this morning/afternoon is postponed.
#* Optics adjustment? (Todd/Jay) 30 min.  
+
#* Optics adjustment (Todd/Jay) 30 min.
#* Production running
+
 
#Discussion ComCal commissioning
 
#Discussion ComCal commissioning
 
#* Runplan (V.3) [https://halldweb.jlab.org/wiki/images/6/68/Run_Plan_Fall_2018-v3.jpg] [https://halldweb.jlab.org/wiki/index.php/File:Run_Plan_Fall_2018-v3b.jpg]  [https://halldweb.jlab.org/wiki/index.php/File:Run_Plan_Fall_2018-v3c.jpg]
 
#* Runplan (V.3) [https://halldweb.jlab.org/wiki/images/6/68/Run_Plan_Fall_2018-v3.jpg] [https://halldweb.jlab.org/wiki/index.php/File:Run_Plan_Fall_2018-v3b.jpg]  [https://halldweb.jlab.org/wiki/index.php/File:Run_Plan_Fall_2018-v3c.jpg]
 
#* [https://halldweb.jlab.org/wiki/images/c/ca/Fall18_week11.jpg Week 11], [https://halldweb.jlab.org/wiki/images/8/8b/Fall18_week12.jpg Week 12], [https://halldweb.jlab.org/wiki/images/5/50/Fall18_week13.jpg Week 13]
 
#* [https://halldweb.jlab.org/wiki/images/c/ca/Fall18_week11.jpg Week 11], [https://halldweb.jlab.org/wiki/images/8/8b/Fall18_week12.jpg Week 12], [https://halldweb.jlab.org/wiki/images/5/50/Fall18_week13.jpg Week 13]
 
#Notes
 
#Notes

Revision as of 19:37, 15 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Thursday, Nov 15 at 08:45

  1. Last 24h:
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Monday maintenance is moved to today, 1pm-4/5pm.
    • Check V-wire position wrt beam (Sacha).
    • Investigate issue with CBrem gui. Meanwhile, fill the target.
    • Production running, starting with amorphous (for CBrem ref.)
    • Optics adjustment (Todd/Jay) 30 min.
      • Access to move back the flux monitor
      • Other access?
    • TAC run this morning/afternoon is postponed.
    • Optics adjustment (Todd/Jay) 30 min.
  5. Discussion ComCal commissioning
  6. Notes