(Thursday, Nov 15 at 08:45)
Line 14: Line 14:
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9]
 
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9]
 
*[https://halldweb.jlab.org/wiki/images/9/90/Fall18_week10.jpg Hall D schedule for week 10]
 
*[https://halldweb.jlab.org/wiki/images/9/90/Fall18_week10.jpg Hall D schedule for week 10]
 +
 +
== Friday, Nov 16 at 08:45 ==
 +
 +
#Last 24h:
 +
#* Check V-wire rate in preparation for TAC on Friday. (Alex Somov)
 +
#* Check issue with CBrem gui. It appears to be gone (Hovanes)
 +
#* Maintenance: 1pm-4/5pm.
 +
#** Access: flux monitor (Tim); FCal (Colin)
 +
#* Standard production running
 +
#Issues
 +
#*
 +
#Reports
 +
#* [] (Thomas)
 +
#Plans
 +
#* [https://halldweb.jlab.org/wiki/images/8/84/Fall18_week9.jpg Time chart for this week]
 +
#* Optics adjustment (Todd/Jay) 30 min.
 +
#* TAC run this morning/afternoon.
 +
#* Standard production running over the week end.
 +
#Notes
  
 
== Thursday, Nov 15 at 08:45 ==
 
== Thursday, Nov 15 at 08:45 ==

Revision as of 07:44, 16 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Friday, Nov 16 at 08:45

  1. Last 24h:
    • Check V-wire rate in preparation for TAC on Friday. (Alex Somov)
    • Check issue with CBrem gui. It appears to be gone (Hovanes)
    • Maintenance: 1pm-4/5pm.
      • Access: flux monitor (Tim); FCal (Colin)
    • Standard production running
  2. Issues
  3. Reports
    • [] (Thomas)
  4. Plans
    • Time chart for this week
    • Optics adjustment (Todd/Jay) 30 min.
    • TAC run this morning/afternoon.
    • Standard production running over the week end.
  5. Notes

Thursday, Nov 15 at 08:45

  1. Last 24h:
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Monday maintenance is moved to today, 1pm-4/5pm.
    • Check V-wire position wrt beam (Sacha).
    • Investigate issue with CBrem gui. Meanwhile, fill the target.
    • Production running, starting with amorphous (for CBrem ref.)
    • Optics adjustment (Todd/Jay) 30 min.
      • Access to move back the flux monitor
      • Other access?
    • TAC run this morning/afternoon is postponed.
    • Optics adjustment (Todd/Jay) 30 min.
  5. Discussion ComCal commissioning
  6. Notes