(Friday, Nov 16 at 08:45)
Line 18: Line 18:
  
 
#Last 24h:
 
#Last 24h:
#* Check V-wire rate in preparation for TAC on Friday. (Alex Somov)
+
#* Check V-wire rate in preparation for TAC on Friday. (Alexander S.)
#* Check issue with CBrem gui. It appears to be gone (Hovanes)
+
#* Check issue with CBrem gui. [https://logbooks.jlab.org/entry/3626532 It appears to be gone] (Hovanes)
 
#* Maintenance: 1pm-4/5pm.  
 
#* Maintenance: 1pm-4/5pm.  
#** Access: flux monitor (Tim); FCal (Colin)
+
#** Access: [https://logbooks.jlab.org/entry/3626690 flux monitor] (Tim); FCal (Colin)
 
#* Standard production running
 
#* Standard production running
 
#Issues
 
#Issues
#* [https://logbooks.jlab.org/entry/3627046 Beam energy monitoring]
+
#* [https://logbooks.jlab.org/entry/3627046 Beam energy monitoring] (Alexandre D.)
 +
#* [https://logbooks.jlab.org/entry/3626628 Shift checklist rejuvenation] (Elton)
 
#Reports
 
#Reports
 +
#* [https://logbooks.jlab.org/entry/3626620 Energy dependent rho polarization for low-energy running] (Alexander A.)
 
#* [ Monitoring] (Thomas)
 
#* [ Monitoring] (Thomas)
 
#Plans
 
#Plans

Revision as of 07:56, 16 November 2018

<- Back to Run Coordination Meetings:Fall2018 Run


Friday, Nov 16 at 08:45

  1. Last 24h:
    • Check V-wire rate in preparation for TAC on Friday. (Alexander S.)
    • Check issue with CBrem gui. It appears to be gone (Hovanes)
    • Maintenance: 1pm-4/5pm.
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Time chart for this week
    • Optics adjustment (Todd/Jay) 30 min.
    • TAC run this morning/afternoon.
    • Standard production running over the week end.
  5. Notes

Thursday, Nov 15 at 08:45

  1. Last 24h:
    • Standard production running
  2. Issues
  3. Reports
  4. Plans
    • Monday maintenance is moved to today, 1pm-4/5pm.
    • Check V-wire position wrt beam (Sacha).
    • Investigate issue with CBrem gui. Meanwhile, fill the target.
    • Production running, starting with amorphous (for CBrem ref.)
    • Optics adjustment (Todd/Jay) 30 min.
      • Access to move back the flux monitor
      • Other access?
    • TAC run this morning/afternoon is postponed.
    • Optics adjustment (Todd/Jay) 30 min.
  5. Discussion ComCal commissioning
  6. Notes